What changed
Every change recorded in DCRA's weekly update, grouped by week and state. Each line comes from a reviewed record and links to its source. This is planning information, not a forecast.
Corrections and status changes are also listed in the corrections ledger. Machine-readable feed: changes.json.
Week of 2026-11-09 54 changes
Georgia
Added to the atlas
- 2026-11-14 Dade County Industrial Park Data Center Proposal: Added an IDA-confirmed public proposal; reported scale is estimated and developer/site remain unknown. Source: Dade County Industrial Development Authority / Dade County; WTVC.
New information
- 2026-11-14 DC BLOX Atlanta West: Added the backup generator air permit (76 generators) and reports of a substation on the site. Source: Georgia EPD Air Protection Branch; Douglas County Sentinel.
- 2026-11-14 Eatonton 379: Added the two alternative power suppliers the applicant names (Tri-County EMC or Georgia Power) and its statement that the development will have substations. Source: Georgia Department of Community Affairs / Putnam County.
- 2026-11-14 Google Columbia County Data Center: Added the county's statement that Google will pay all of the project's energy costs. Source: Columbia County, Georgia.
- 2026-11-14 Google LaGrange Data Center: Added a Google statement on generation costs and, as area context, a regional review filing for a project called PRL2 that does not name Google. Source: WSB-TV; Georgia Department of Community Affairs (applicant filing).
- 2026-11-14 Microsoft ATL80: Added the applicant's description of an on-site substation and a transmission line extension from the regional review filing. Source: Georgia Department of Community Affairs / Floyd County.
- 2026-11-14 OpenAI Project Camellia: Added Georgia Power's statement that its contract to serve the project was approved, with 3,200 MW of new demand and up to 1,000 MW of flexible demand response. Source: Georgia Power.
- 2026-11-14 QTS Augusta: Added the backup generator permit application (224 critical and 12 house generators) and Georgia Power's reported remarks that the campus will connect to its grid. Source: Georgia EPD Air Protection Branch; The Augusta Press.
- 2026-11-14 QTS Blakely: Added the applicant's filed power details: GA Power named as supplier, 1,500 MW estimated peak load pending utility studies, and an on-site substation and transmission lines. Source: Georgia Department of Community Affairs (applicant filing); Georgia Department of Community Affairs (applicant filing).
Kansas
New information
- 2026-11-14 Alcove Project Catalyst: Added the applicant's statement that a substation site is allocated and that electric service will be coordinated through Evergy. Source: Applicant (posted by City of Osawatomie).
- 2026-11-14 Beale De Soto Data Center: Added the developer's description of private on-site substations alongside the public Evergy substation, the city's statement on backup generators, and Evergy's 345 kV project in the De Soto area as area context. Source: Beale Infrastructure; City of De Soto, Kansas; Evergy.
- 2026-11-14 Digital Realty Astra Enterprise Park: Added the city's account of Digital Realty's statements that it will fund the electric infrastructure the project needs and use generators only for emergencies and testing. Source: City of De Soto, Kansas.
- 2026-11-14 Google Project Helium: Added Google's planned connection to a local substation and the county deal summary's limits on generator use. Source: Google (posted by Barber County); Barber County, Kansas.
- 2026-11-14 Red Wolf DCD Data Center: Added reported BPU transmission thresholds and developer cost statements as area context only. Facility-specific utility, capacity, and agreement terms remain unknown; project status was not re-reviewed. Source: The Beacon.
Correction
- 2026-11-14 Alcove Project Catalyst: Removed the repurposed city news URL from current citations: it now describes a separate 116-acre Northland exploration. Retained the 283-acre Catalyst announcement and existing stage. Previously: ks-catalyst-city-update cited as current Catalyst evidence. Source: City of Osawatomie and Alcove Development.
Kentucky
Permit / regulatory
- 2026-11-14 TeraWulf Justified Data: Added the PSC order on the service agreement: Kenergy retail service with Big Rivers buying through MISO, curtailment terms, and about 10 MW of emergency generation. Source: Kentucky Public Service Commission.
- 2026-11-14 TeraWulf Muskie Data Campus: Added Kentucky Power's service schedule (100 MW from October 2028, 1,000 MW by October 2029) and its application for a new 765/345 kV substation and gas plant it says are needed to serve the campus. Source: Kentucky Power Company; Kentucky Power Company (filed with the Kentucky Public Service Commission).
Project status
- 2026-11-14 TeraWulf Justified Data: November issuer filing explicitly reports campus-wide construction underway; approved service is reported at 482 MW, with delivery targeted for late 2027 through Q2 2028. Google credit support and Fluor EPC agreements are recorded. Previously: Development; PROPOSED; 480 MW gross availability in the earlier company announcement. Source: TeraWulf Inc.; TeraWulf Inc. / U.S. Securities and Exchange Commission. Public submission.
New information
- 2026-11-14 Brookfield Paducah: Added DOE's announcement naming Big Rivers and Jackson Purchase Energy Cooperative as the planned power suppliers, with 2 GW of gas generation and up to 2.6 GW of battery storage planned. Source: U.S. Department of Energy, Office of Environmental Management.
- 2026-11-14 DartPoints Lexington: Added DartPoints' statement that the redevelopment needs no new transmission lines. Source: DartPoints.
- 2026-11-14 PowerHouse Louisville: Added reported site plans showing an on-site substation and generators and, as area context, PSC filings about the Camp Ground project that do not name PowerHouse. Source: Louisville Public Media; Kentucky Public Service Commission; LG&E and KU (filed with the Kentucky Public Service Commission).
Louisiana
Project status
- 2026-11-14 Amazon Northwest Louisiana: Recorded reported Shreveport special-use permit appeal within the three-campus program; latest court disposition and building construction remain unconfirmed. Previously: Announced / planned; PROPOSED. Source: KTAL/KMSS via AOL. Public submission.
New information
- 2026-11-14 Amazon Northwest Louisiana: Added SWEPCO's statement that the customer will fund project-specific substations and lines, and the parish's note that the Bossier site plan includes a new substation. Source: SWEPCO; Bossier Parish Police Jury.
- 2026-11-14 Hut 8 River Bend: Issuer reports structural steel and foundations completed across four halls and initial campus substation energization; first data-hall delivery remains targeted for Q2 2027. Source: Hut 8 Corp..
- 2026-11-14 Hut 8 River Bend: Added Entergy's own statement of the agreement: an initial 330 MW of utility capacity for 245 MW of critical IT load, with operations expected by the second quarter of 2027. Source: Entergy; Hut 8.
- 2026-11-14 Meta Richland Parish (Hyperion): Added, as area context, Entergy's open request (LPSC Docket U-37882) to serve a second proposed data center load next to the site, and a reported account of Entergy gas turbines for the data center. Source: Louisiana Public Service Commission; Louisiana Public Service Commission; Louisiana Illuminator.
Maryland
Permit / regulatory
- 2026-11-14 Rowan Bauxite Campus: Added the state environment department's letter about generator foundations built at Bauxite I. Source: Maryland Department of the Environment, Air and Radiation Administration.
- 2026-11-14 TeraWulf Morgantown: Added FERC's July 2026 order authorizing the transaction without a condition on removing the plant's units from the PJM market. Source: Federal Energy Regulatory Commission (copy hosted by TheBayNet).
New information
- 2026-11-14 Aligned Data Centers Frederick (IAD-04): Added the PSC order's description of the power supply: two 230 kV lines from Potomac Edison's Lime Kiln and Sage substations. Source: Maryland Public Service Commission.
- 2026-11-14 Atmosphere Dickerson Campus: Added the developer's statement that power will come over FirstEnergy lines bordering the site; the serving utility remains unsettled. Source: Atmosphere Data Centers (project website).
- 2026-11-14 Quantum Frederick: Added independent Banner corroboration of recorded construction activity and litigation; no new court disposition or operating phase established. Source: The Baltimore Banner. Public submission.
- 2026-11-14 Quantum Frederick: Added Potomac Edison's statement that it analyzed the campus's power requirements; the analysis itself is not published. Source: Potomac Edison (FirstEnergy), posted by Frederick County.
Correction
- 2026-11-14 TeraWulf Morgantown: Clarified that the acquisition remains pending closing and regulatory approvals in the November issuer filing; an earlier regulatory authorization is not transaction closing. Previously: In development; generation described as acquired with the site. Source: TeraWulf Inc..
Ohio
New information
- 2026-11-14 AWS Sidney: Added the city's statements that the facility will use the existing AES Ohio grid and that Amazon is modeling load impacts with AES Ohio and PJM. Source: City of Sidney.
- 2026-11-14 Meta Piqua: Added a news report that plans call for AES Ohio to provide permanent service through a transmission connection, with 10 MW of temporary construction power. Source: Dayton Daily News.
- 2026-11-14 PORTS-Pike Technology Campus: Added, as area context, AEP's siting application stating SB Energy's 9,200 MW request near Piketon and AEP Ohio's statement on who pays for the new 765 kV transmission. Source: AEP Ohio Transmission Company; AEP Ohio.
Texas
Added to the atlas
- 2026-11-14 SpaceX Starbase Super-compute Facility: Added to the atlas from a reviewed public project record. Source: City of Starbase, Texas.
New information
- 2026-11-15 Hut 8 Beacon Point: Added a "Who does what?" reference: the city, county, emergency, environmental, electricity, and project organizations around the campus, what each can decide, and where to ask for records. New records: city staff reviewed and recommended approval of a final plat naming Beacon Point DC LLC as owner (June 10, 2026 packet; the vote and recording are not verified), and the county listed a closed-session item on a proposed Beacon Point reinvestment zone on May 13, 2026. Source: City of Corpus Christi, Planning Commission; Nueces County Commissioners Court; Nueces County Commissioners Court.
- 2026-11-14 Cipher Barber Lake: Added Cipher's risk statement about batching of large load interconnection requests. Source: Cipher Digital (filed with the U.S. Securities and Exchange Commission).
- 2026-11-14 Fermi America HyperGrid (Project Matador): Recorded the current company-described 17 GW private-power campus plan separately from its historical 11 GW announcement; neither represents operating generation or facility draw. Source: Fermi America.
- 2026-11-14 Hut 8 Beacon Point: Company reports substation and Phase 1 foundation/underground utility work, with initial data-hall delivery targeted for Q3 2027 (Phase 1) and Q2 2028 (Phase 2). Source: Hut 8 Corp..
- 2026-11-14 IREN Sweetwater 1: Added IREN's statement that changes to ERCOT's Batch Zero procedures may delay energization at its Texas projects. Source: IREN Limited (filed with the U.S. Securities and Exchange Commission).
- 2026-11-14 Skybox Old Settlers: Added a reported Skybox statement that it is working with Oncor and ERCOT on power capacity. Source: CBS Austin.
- 2026-11-14 Stargate Abilene (Crusoe): Added the grid connection (AEP Texas, Mulberry Creek 345 kV station, 1.2 GW grid interconnection), 360.5 MW of permitted on-site gas turbines, the city's tax abatement terms, and ten filed grid projects with who pays for them. No project's cost is published except a proposed $11.485 billion regional 765 kV loop, which is not assigned to any facility. Source: Electric Reliability Council of Texas (ERCOT); AEP Service Corporation, posted by ERCOT; Texas Commission on Environmental Quality (TCEQ); Crusoe; City of Abilene.
Utah
Permit / regulatory
- 2026-11-14 Stratos Project: KSL reports a new permanent water-use change application submitted October 15. Primary application details did not render; no water-right approval, actual use or reconciled generation capacity is inferred. Source: KSL. Public submission.
New information
- 2026-11-14 Antelope Data Center: Added a developer-commissioned study describing a dedicated on-site gas plant and five buildings of 300 MW critical load each. Source: Alpen Economics (posted on the project website).
- 2026-11-14 Creekstone Gigasite: Added a reported company plan to deliver over 600 MW of on-site baseload power in 2027; the company page gives 220 MW for phase 1. Source: POWER Magazine.
- 2026-11-14 Meta Eagle Mountain Expansion: Added, as area context, a private generation application (Project Aquila) that does not name Meta. Source: Will-Power UT, LLC (filed with the Utah Public Service Commission).
- 2026-11-14 QTS Eagle Mountain SLC1: Added a 2025 report that Rocky Mountain Power's assurance of power for the first phase no longer held, and a 2026 report of state approval for diesel generators. Source: Cedar Valley Sentinel; Grist.
- 2026-11-14 Stratos Project: Added the county's statement that the project will generate all its own power on site and take none from the local grid. Source: Box Elder County; Deseret News.
Virginia
Added to the atlas
- 2026-11-14 STACK Project Crossroads (Berry Hill): Added to the atlas from a reviewed public project record. Source: Cardinal News; Virginia Business. Public submission.
New information
- 2026-11-14 Google Loudoun County: Added a 2017 report that the Stonewall site is next to a power plant and a transmission corridor; proximity only. Source: Loudoun Now.
- 2026-11-14 Oasis Russell County: Added the developer's reported statement that Appalachian Power expects to deliver 100 MW by 2028, with engineering studies still unfinished. Source: Virginia Business.
- 2026-11-14 QTS Richmond: Added a 2019 description of a 110-megawatt substation at the site. Source: Henrico Economic Development Authority.
Week of 2026-11-02 10 changes
Texas
New information
- 2026-11-02 Fermi America HyperGrid (Project Matador): TCEQ's technical review confirms the gas plant's nominal capacity of about 6,000 MW, used only on site (previously a company release). Added Fermi's statement of a 200 MW grid service agreement with SPS over its 115 kV system. Source: Texas Commission on Environmental Quality (TCEQ); Fermi America (PR Newswire); Southwestern Public Service Company (SPS), filed at the PUCT.
- 2026-11-02 Hut 8 Beacon Point: Hut 8's SEC filings now confirm the campus substation is under construction on the site (previously a trade report only); its owner and voltage remain unpublished. Added the site's stormwater construction authorization and an ERCOT-accepted study of the Lon Hill area that modeled a code-named 1,000 MW load not linked to Beacon Point by any source. Source: Hut 8 Corp. (SEC EDGAR); Hut 8 Corp. (SEC EDGAR); U.S. Environmental Protection Agency (Facility Registry Service); ERCOT and AEP Service Corporation, filed at the PUCT.
- 2026-11-02 Meta El Paso Data Center: Added El Paso Electric's filing that Meta's subsidiary committed to 1,000 MW of peak demand by the end of 2029, with the first ~220 MW from existing resources and transmission not projected before 2028, and TCEQ's standard permit for on-site generating units. Source: El Paso Electric Company, filed at the PUCT; El Paso Electric Company, filed at the PUCT; Texas Commission on Environmental Quality (TCEQ).
- 2026-11-02 Meta Temple Data Center: Added Oncor and LCRA's discovery answer that they are not aware whether the Temple data centers are in their STEP plan's load cases. Source: Oncor Electric Delivery and LCRA Transmission Services Corporation, filed at the PUCT.
- 2026-11-02 Red Oak PD-191 data center campus: Added a news report that a city briefing cited $72 million in grid reinforcements for the project (secondhand; the briefing was not found). Source: Dallas Observer.
- 2026-11-02 Riot Corsicana Facility: Added Riot's stated direct 345 kV interconnection, its report of curtailments on Oncor and ERCOT instructions, and ERCOT's recommended Oncor upgrades in an area that includes Navarro County. Source: Riot Platforms; Riot Platforms (SEC EDGAR); Electric Reliability Council of Texas (ERCOT).
- 2026-11-02 Stargate Abilene (Crusoe): Added grid documents: the developer's statements that the campus has a 1.2 GW interconnect fully approved by ERCOT (not confirmed by an ERCOT or AEP Texas record), draft air permits for a Crusoe power plant in Abilene, and a contractor's account of substation work. Source: Lancium, filed at the PUCT; Texas Commission on Environmental Quality (TCEQ); Mortenson.
- 2026-11-02 Stargate Milam County (SB Energy): Added SB Energy's filed power phases (about 660 MW of initial load, August 2026 to February 2027, fed at 345 kV from its Orion solar projects) and 753 MW of leased IT capacity. Company targets, not confirmed energization. Source: SB Energy, Inc. (SEC EDGAR).
- 2026-11-02 Switch 300 Dell Way phase 2: Added the state construction registration for a 72,600 sq ft building (SWITCH AUS 05 EVO DC), June 2026 to June 2028. Source: Texas Department of Licensing and Regulation.
- 2026-11-02 Vantage Frontier (Stargate Shackelford County): Added VoltaGrid's gas generation permits in Shackelford County (709 MW standard permit; a pending larger plant whose power the applicant says goes to a nearby data center). The permits do not name Vantage or Frontier. Source: Texas Commission on Environmental Quality (TCEQ); Texas Commission on Environmental Quality (TCEQ).
Week of 2026-10-26 12 changes
Georgia
Added to the atlas
- 2026-10-28 Eatonton 379: Added to the atlas from a reviewed public project record.
- 2026-10-28 Microsoft ATL80: Added from the October 20 DRI filing.
Kentucky
Added to the atlas
- 2026-10-28 Meta Mason County: Added to the atlas from a reviewed public project record. Public submission.
- 2026-10-28 TeraWulf Muskie Data Campus: Added to the atlas from a reviewed public project record. Public submission.
New information
- 2026-10-28 PowerHouse Louisville: Added direct AREP property-page corroboration for the existing 154-acre campus area; retained the newer campus power plan separately. Source: American Real Estate Partners. Public submission.
Ohio
Added to the atlas
- 2026-10-28 AWS Sidney: Added to the atlas from a reviewed public project record. Public submission.
- 2026-10-28 Meta Piqua: Added to the atlas from a reviewed public project record. Public submission.
Texas
Project status
- 2026-10-28 Fermi America HyperGrid (Project Matador): Company explicitly reports campus construction progress; stage changed to UNDER_CONSTRUCTION. No data-hall delivery or nuclear operating authorization established. Previously: Power campus in development; nuclear combined-license review pending; PERMITTING. Source: Fermi America; U.S. Nuclear Regulatory Commission / Federal Register. Public submission.
New information
- 2026-10-28 Vantage Frontier (Stargate Shackelford County): Added the direct company campus page corroborating the existing 1,200-acre and ten-building program. Source: Vantage Data Centers. Public submission.
Correction
- 2026-10-28 Fermi America HyperGrid (Project Matador): Current company campus scope is approximately 8,400 acres, replacing the earlier 5,800-acre announcement; not a surveyed boundary. Previously: 5,800 acres planned. Source: Fermi America. Public submission.
- 2026-10-28 Hut 8 Beacon Point: Removed the sourced prevailing-wind default: the cited NWS page studies selected severe-wind events and does not establish prevailing wind climatology. Local prevailing wind is UNKNOWN; scenario wind remains an illustrative input. Previously: 135 degrees; NWS Corpus Christi prevailing SE. Source: National Weather Service, Corpus Christi (CRP).
Utah
Permit / regulatory
- 2026-10-28 Antelope Data Center: Approved June 4 minutes establish a conditional-use permit grant with amended conditions. Stage remains PERMITTING; later permits and construction are unresolved. Source: Iron County Planning Commission.
Week of 2026-10-12 12 changes
Kansas
Permit / regulatory
- 2026-10-15 Beale De Soto Data Center: City approved Supplement #2 on October 1: lower expected peak water demand, approximately $9.4 million community water infrastructure and up to $20 million conditional betterment funding. Source: City of De Soto. Public submission.
New information
- 2026-10-15 Digital Realty Astra Enterprise Park: Current city and developer pages support Astra North’s proposed 280 acres, nine buildings and approximately 3 million square feet, replacing earlier UNKNOWN phase fields; company announces household-credit commitment with terms not yet final. Source: Digital Realty; Digital Realty; City of De Soto, Kansas. Public submission.
Kentucky
New information
- 2026-10-15 PowerHouse Louisville: Current developer page describes up to 525 MW with coordinated on-site energy infrastructure; secured utility service and actual operating load remain unresolved. Source: PowerHouse Data Centers / Poe Companies.
Louisiana
Project status
- 2026-10-15 Hut 8 River Bend: October 5 on-site reporting describes active River Bend construction; stage changed from proposed to under construction at moderate confidence. Previously: Under development · lease signed Dec 2025; PROPOSED. Source: WAFB. Public submission.
Maryland
Permit / regulatory
- 2026-10-15 Quantum Frederick: County confirms new-application pause until 2027 while earlier approved construction continues; October reporting describes a disputed Quantum Maryland lawsuit. A City of Frederick moratorium proposal is a separate jurisdiction. Source: Frederick County, Maryland; FOX45 / WBFF. Public submission.
Texas
Project status
- 2026-10-15 Fermi America HyperGrid (Project Matador): NRC draft EIS establishes pending combined-license review for four proposed nuclear units; campus stage changed to permitting, without asserting data-hall construction. Previously: Early development; PROPOSED. Source: U.S. Nuclear Regulatory Commission / Federal Register.
- 2026-10-15 Stargate Milam County (SB Energy): SB Energy now identifies Milam as under construction; current capacity scope remains unresolved against the earlier 1,200 MW announcement. Previously: Under development · Phase 1 filed with TDLR; PERMITTING. Source: SB Energy; Texas Economic Development Corporation. Public submission.
New information
- 2026-10-15 Cipher Barber Lake: September 25 amendment extends contracted duration to 20 years and shifts data-hall delivery targets to Q4 2026–Q1 2027; no completed delivery established. Source: Cipher Digital Inc. via GlobeNewswire. Public submission.
- 2026-10-12 Hut 8 Beacon Point: Recorded that the first 352 MW IT lease requires about 500 MW of utility capacity, and that Hut 8's release names AEP Texas as the party to the 1,000 MW interconnection agreement. Source: Hut 8 Corp. (via PR Newswire).
- 2026-10-12 Hut 8 Beacon Point: Hut 8's project page says the company pre-funded the infrastructure costs required to serve its load; a trade report says substation construction has commenced. The amount paid and the substation's location remain unknown. Source: Hut 8 Corp.; Engineering News-Record.
- 2026-10-12 Hut 8 Beacon Point: Added area grid context: ERCOT's April 2026 review found that a separate 1,150 MW load in Nueces County requires transmission upgrades. The county's existing supply capacity is not published, and ERCOT's project list does not name the station serving Beacon Point. Recorded the generating capacity located in the county: about 3,040 MW net summer. Source: Electric Reliability Council of Texas (ERCOT); Electric Reliability Council of Texas (ERCOT); U.S. Energy Information Administration.
Utah
New information
- 2026-10-15 Stratos Project: Developer describes pre-construction and an approximately 13,000-acre campus; retain April MIDA area as history, cite Senate concessions and distinguish conflicting generation plans. Grow the Flow is OWNER_REVIEWED only; revised water-rights filing remains unconfirmed. Source: O’Leary Digital; Military Installation Development Authority; Utah Senate; KSL; Business Insider; Box Elder County; Utah Clean Energy; Wikipedia; Grow the Flow. Public submission.
Week of 2026-10-05 3 changes
Texas
New information
- 2026-10-07 Hut 8 Beacon Point: In a follow-up, the ESD #1 chief wrote that cost recovery for an extended response has not been discussed (the district typically charges only for hazmat responses) and that the district has attended a multi-agency site-plan meeting for the construction phases, with more planned. Source: Nueces County Emergency Services District #1 (Annaville Fire Department).
- 2026-10-06 Hut 8 Beacon Point: The Nueces County ESD #1 (Annaville) fire chief wrote that the district has fire jurisdiction of the area while the City of Corpus Christi Fire Marshal's Office reviews the fire code, including fire flow. Previously: Primary fire jurisdiction UNKNOWN. Source: Nueces County Emergency Services District #1 (Annaville Fire Department).
- 2026-10-06 Hut 8 Beacon Point: The chief reported battery-fire training for responding crews, a pre-plan covering reignition monitoring, and mutual aid with the Corpus Christi Fire Department and the Refinery Terminal Fire Company (RTFC); runoff containment has not been addressed yet. Source: Nueces County Emergency Services District #1 (Annaville Fire Department).
Week of 2026-09-28 31 changes
Georgia
Added to the atlas
- 2026-09-29 DC BLOX Atlanta West: Added to the atlas.
- 2026-09-29 Google Columbia County Data Center: Added to the atlas.
- 2026-09-29 Google LaGrange Data Center: Added to the atlas.
- 2026-09-29 OpenAI Project Camellia: Added to the atlas.
- 2026-09-29 QTS Augusta: Added to the atlas.
- 2026-09-29 QTS Blakely: Added to the atlas.
New information
- 2026-10-03 OpenAI Project Camellia: Plaintiffs filed an open-meetings and records complaint concerning Project Camellia; the allegations are not adjudicated. Source: Superior Court of Effingham County (copy published by Southern Environmental Law Center).
- 2026-09-30 QTS Augusta: Added the primary fire department named by QTS (Augusta Fire Department) and the announced $2B investment. Source: QTS Data Centers.
- 2026-09-30 QTS Blakely: Added the primary fire department named by QTS (Blakely Fire Department). Source: QTS Data Centers.
Correction
- 2026-09-30 OpenAI Project Camellia: Power supply relabeled as being contracted: OpenAI says it is contracting for 3.2 GW, not that a contract is signed. Previously: Contracted phased power delivery. Source: OpenAI.
Kansas
Added to the atlas
- 2026-09-28 Alcove Project Catalyst: Added to the atlas.
- 2026-09-28 Beale De Soto Data Center: Added to the atlas.
- 2026-09-28 Digital Realty Astra Enterprise Park: Added to the atlas.
- 2026-09-28 Google Project Helium: Added to the atlas.
- 2026-09-28 Red Wolf DCD Data Center: Added to the atlas.
Kentucky
Project status
- 2026-09-30 PowerHouse Louisville: Independent local reports describe construction activity at the campus. Previously: In development. Source: The Louisville Cardinal; Spectrum News 1.
Ohio
Added to the atlas
- 2026-09-30 PORTS-Pike Technology Campus: Added to the atlas.
Texas
Project status
- 2026-10-03 Hut 8 Beacon Point: Corrected the stage to under construction: Hut 8's July release says construction had commenced. Previously: Under development · fully leased; PERMITTING. Source: Hut 8 Corp. (via PR Newswire).
Added to the atlas
- 2026-10-01 Sabey SDC Austin: Added to the atlas.
- 2026-10-01 Skybox Old Settlers: Added to the atlas.
- 2026-10-01 Switch 300 Dell Way phase 2: Added to the atlas.
- 2026-10-01 Switch Round Rock East Campus: Added to the atlas.
- 2026-09-30 Red Oak PD-191 data center campus: Added to the atlas.
New information
- 2026-10-03 Hut 8 Beacon Point: Commissioner Pusley said the county declined to offer Hut 8 a tax abatement; no formal decision record was located. Source: Corpus Christi Caller-Times (republished by AOL).
Correction
- 2026-10-03 Hut 8 Beacon Point: Hut 8's representative reported on-site backup generation for the project; installation, type, fuel, and capacity remain unknown. Previously: Backup generation (type, fuel, capacity) UNKNOWN. Source: KRIS 6 News.
Utah
Added to the atlas
- 2026-10-04 Antelope Data Center: Added to the atlas.
- 2026-10-04 Creekstone Gigasite: Added to the atlas.
- 2026-10-04 Meta Eagle Mountain Expansion: Added to the atlas.
- 2026-10-04 QTS Eagle Mountain SLC1: Added to the atlas.
- 2026-10-04 Stratos Project: Added to the atlas.
Virginia
Added to the atlas
- 2026-09-30 Oasis Russell County: Added to the atlas.
Week of 2026-09-21 35 changes
Kentucky
Added to the atlas
- 2026-09-26 Brookfield Paducah: Added to the atlas.
- 2026-09-26 DartPoints Lexington: Added to the atlas.
- 2026-09-26 PowerHouse Louisville: Added to the atlas.
- 2026-09-26 TeraWulf Justified Data: Added to the atlas.
Louisiana
Added to the atlas
- 2026-09-25 Amazon Northwest Louisiana: Added to the atlas.
- 2026-09-25 Applied Digital Delta Forge 1: Added to the atlas.
- 2026-09-25 Hut 8 River Bend: Added to the atlas.
- 2026-09-25 Meta Richland Parish (Hyperion): Added to the atlas.
Maryland
Added to the atlas
- 2026-09-26 AiNET One Market Center: Added to the atlas.
- 2026-09-26 Aligned Data Centers Frederick (IAD-04): Added to the atlas.
- 2026-09-26 Atmosphere Dickerson Campus: Added to the atlas.
- 2026-09-26 Quantum Frederick: Added to the atlas.
- 2026-09-26 Rowan Bauxite Campus: Added to the atlas.
- 2026-09-26 TeraWulf Morgantown: Added to the atlas.
Ohio
Added to the atlas
- 2026-09-27 AWS New Albany: Added to the atlas.
- 2026-09-27 Google Lancaster: Added to the atlas.
- 2026-09-27 Meta New Albany: Added to the atlas.
- 2026-09-27 Vantage OH1 New Albany: Added to the atlas.
Texas
Added to the atlas
- 2026-09-24 Cipher Barber Lake: Added to the atlas.
- 2026-09-24 Galaxy Helios: Added to the atlas.
- 2026-09-24 Google Haskell County (with Intersect Quantum): Added to the atlas.
- 2026-09-24 Google Midlothian (Ellis County): Added to the atlas.
- 2026-09-24 IREN Sweetwater 1: Added to the atlas.
- 2026-09-24 Meta Temple Data Center: Added to the atlas.
- 2026-09-24 Riot Corsicana Facility: Added to the atlas.
- 2026-09-24 Stargate Milam County (SB Energy): Added to the atlas.
- 2026-09-24 Vantage Frontier (Stargate Shackelford County): Added to the atlas.
- 2026-09-23 Fermi America HyperGrid (Project Matador): Added to the atlas.
- 2026-09-23 Hut 8 Beacon Point: Added to the atlas.
- 2026-09-23 Meta El Paso Data Center: Added to the atlas.
- 2026-09-23 Stargate Abilene (Crusoe): Added to the atlas.
Virginia
Added to the atlas
- 2026-09-25 Google Loudoun County: Added to the atlas.
- 2026-09-25 Meta Henrico: Added to the atlas.
- 2026-09-25 Microsoft Boydton: Added to the atlas.
- 2026-09-25 QTS Richmond: Added to the atlas.