Dade County Industrial Park Data Center Proposal

UNKNOWN (prospective developer not named by the IDA) · Dade County, Georgia

Open in the interactive atlas →

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Proposed; public informational meeting scheduled
Sourced · strong
Reported potential power requirement
Approximately 300 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). reported potential requirement
Estimate · weak
Scheduled informational meeting
November 23, 2026, 6 p.m., Dade County Court Facility, Trenton
Sourced · strong
Secured facility electrical draw capacity (MW)
Not in the public record
Campus area
Not in the public record

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 1 terms used on this page
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).

Profile

Dade County’s IDA has announced a November 23 public meeting about an unnamed company’s interest in a data center at one of its industrial parks. WTVC reports a potential power requirement of about 300 MW. Developer identity, site, secured service and approvals remain unresolved; reporting on whether a proposed moratorium was adopted conflicts. Calculated · fair

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Backup generation
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Primary fire jurisdiction
Not in the public record

Fire and rescue stations (10)

NameStraight-line distanceRole
Rome - Floyd County Fire Department Station 7
Rome-Floyd Fire Department
42 mi SSEPotential mutual-aid origin
Rome - Floyd County Fire Department Station 9
Rome-Floyd Fire Department
43 mi SEPotential mutual-aid origin
Rome - Floyd County Fire Department Station 5
Rome-Floyd Fire Department
44 mi SSEPotential mutual-aid origin
Rome - Floyd County Fire Department Station 6
Rome-Floyd Fire Department
44 mi SSEPotential mutual-aid origin
Rome - Floyd County Fire Department Station 1
Rome-Floyd Fire Department
45 mi SSEPotential mutual-aid origin
Bartow County Fire Department Station 10
Bartow County Fire Department
46 mi SEPotential mutual-aid origin
Rome - Floyd County Fire Department Station 4
Rome-Floyd Fire Department
46 mi SSEPotential mutual-aid origin
Rome - Floyd County Fire Department Station 3
Rome-Floyd Fire Department
47 mi SSEPotential mutual-aid origin
Rome - Floyd County Fire Department Station 2
Rome-Floyd Fire Department
48 mi SSEPotential mutual-aid origin
Bartow County Fire Department Station 15
Bartow County Fire Department
50 mi SEPotential mutual-aid origin

Hospitals (2)

NameStraight-line distanceEmergency department
AdventHealth Redmond44 mi SSENot in the public record
Atrium Health Floyd​ Medical Center45 mi SSENot in the public record

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Developer identity, end user, industrial park and parcel location
  • Primary-record power requirement, secured service and investment
  • Moratorium adoption, approvals, construction and phase schedule
  • Cooling, water, backup generation and emergency-response jurisdiction

Changes (1)

Related data centers

Others in Georgia

Cite this record

"Dade County Industrial Park Data Center Proposal", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/dade-county-industrial-park-proposal, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.