Hut 8 River Bend

Hut 8 Corp. (developer); Fluidstack (tenant) · West Feliciana Parish, Louisiana

Open in the interactive atlas →

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Under construction (October 5 on-site reporting)
Estimate · fair
Initial Data hall delivery: When finished computer rooms are handed over to the tenant. target
Q2 2027
Sourced · fair
Leased IT capacity
245 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). (Fluidstack, 15 yr)
Sourced · strong
Phase I investment
Up to $10B
Sourced · fair
Lease contract value
$7.0 billion over 15 years; Google financial backstop
Sourced · strong

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 7 terms used on this page
IT lease
A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.
Utility capacity
The most power the grid connection is sized to deliver: the size of the pipe. Draw is how much is flowing at a given moment, and is usually lower.
Interconnection agreement
The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
UPS (uninterruptible power supply)
Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Energization
The first time power flows to a new site from the grid. It comes before full operation.
Data hall delivery
When finished computer rooms are handed over to the tenant.

Profile

Hut 8's River Bend campus in St. Francisville, West Feliciana Parish, announced by the state as an up-to-$10 billion Phase I AI data center powered by Entergy Louisiana. October 5 on-site reporting describes active construction; operation is not confirmed. In December 2025 Hut 8 signed a 15-year, 245 MW IT lease: A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load. with Fluidstack worth $7.0 billion, with a Google financial backstop and a right of first offer on up to 1,000 MW more. Estimate · fair

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules · MISO

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
Not in the public record
Backup generation
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Primary fire jurisdiction
Not in the public record

Fire and rescue stations (190)

NameStraight-line distanceRole
Saint Francisville Volunteer Fire Department
Saint Francisville Fire Department
0.8 mi SSENearby origin
Wakefield Volunteer Fire Department
Fire Protection Dist. No.1 Of West Feliciana Parish
7.0 mi NNENearby origin
New Roads Fire Department7.5 mi SSWNearby origin
Pecan Grove Volunteer Fire Department8.9 mi SENearby origin
Jackson Volunteer Fire Department
Jackson Fire Department
10 mi ENENearby origin
Weyanoke Volunteer Fire Department
Fire Protection Dist. No.1 Of West Feliciana Parish
11 mi NNWNearby origin
Pointe Coupee Fire District 3 - Alma Firehouse
Pointe Coupee Fire District 3
13 mi SPotential mutual-aid origin
Morganza Volunteer Fire Department13 mi WSWPotential mutual-aid origin
West Baton Rouge Fire Station 61 - Rosehill13 mi SSEPotential mutual-aid origin
Zachary Fire Rescue Station 82
Zachary Fire-Rescue
14 mi SEPotential mutual-aid origin

The nearest 10 of 190. See all of them in the atlas →

Hospitals (30)

NameStraight-line distanceEmergency department
West Feliciana Hospital0.9 mi ESENot in the public record
Pointe Coupee General Hospital8.8 mi SSWNot in the public record
Feliciana Forensic Facility10 mi ENENot in the public record
Villa Feliciana Medical Complex13 mi ENENot in the public record
Lane Regional Medical Center17 mi SENot in the public record
Behavioral Hospital of Southeast Louisiana25 mi SENot in the public record
Baton Rouge General Hospital Mid City27 mi SSENot in the public record
Baton Rouge Behavioral Hospital27 mi SSENot in the public record
Field Memorial Community Hospital28 mi NENot in the public record
Baton Rouge Rehabilitation Hospital31 mi SSENot in the public record

The nearest 10 of 30. See all of them in the atlas →

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Site location (only a locality point is shown)
  • Utility Interconnection agreement: The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for. capacity
  • Backup generation and battery/UPS systems
  • Local response resources not yet recorded

Changes (4)

  • 2026-11-14 New information Hut 8 River Bend: Issuer reports structural steel and foundations completed across four halls and initial campus substation energization; first data-hall delivery remains targeted for Q2 2027. Source: Hut 8 Corp..
  • 2026-11-14 New information Hut 8 River Bend: Added Entergy's own statement of the agreement: an initial 330 MW of utility capacity for 245 MW of critical IT load, with operations expected by the second quarter of 2027. Source: Entergy; Hut 8.
  • 2026-10-15 Project status Hut 8 River Bend: October 5 on-site reporting describes active River Bend construction; stage changed from proposed to under construction at moderate confidence. Previously: Under development · lease signed Dec 2025; PROPOSED. Source: WAFB. Public submission.
  • 2026-09-25 Added to the atlas Hut 8 River Bend: Added to the atlas.

Related data centers

Others in Louisiana

Cite this record

"Hut 8 River Bend", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/hut8-river-bend, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.