Hut 8 River Bend
- Under construction
- AI campus
- 8 sources
- Last checked Nov 14, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Under construction (October 5 on-site reporting)
- Estimate · fair
- Initial Data hall delivery: When finished computer rooms are handed over to the tenant. target
- Q2 2027
- Sourced · fair
- Leased IT capacity
- 245 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). (Fluidstack, 15 yr)
- Sourced · strong
- Phase I investment
- Up to $10B
- Sourced · fair
- Lease contract value
- $7.0 billion over 15 years; Google financial backstop
- Sourced · strong
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 7 terms used on this page
- IT lease
- A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.
- Utility capacity
- The most power the grid connection is sized to deliver: the size of the pipe. Draw is how much is flowing at a given moment, and is usually lower.
- Interconnection agreement
- The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
- Energization
- The first time power flows to a new site from the grid. It comes before full operation.
- Data hall delivery
- When finished computer rooms are handed over to the tenant.
Profile
Hut 8's River Bend campus in St. Francisville, West Feliciana Parish, announced by the state as an up-to-$10 billion Phase I AI data center powered by Entergy Louisiana. October 5 on-site reporting describes active construction; operation is not confirmed. In December 2025 Hut 8 signed a 15-year, 245 MW IT lease: A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load. with Fluidstack worth $7.0 billion, with a Google financial backstop and a right of first offer on up to 1,000 MW more. Estimate · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules · MISO
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
- Backup generation
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Primary fire jurisdiction
- Not in the public record
Fire and rescue stations (190)
| Name | Straight-line distance | Role |
|---|---|---|
| Saint Francisville Volunteer Fire Department | 0.8 mi SSE | Nearby origin |
| Wakefield Volunteer Fire Department | 7.0 mi NNE | Nearby origin |
| New Roads Fire Department | 7.5 mi SSW | Nearby origin |
| Pecan Grove Volunteer Fire Department | 8.9 mi SE | Nearby origin |
| Jackson Volunteer Fire Department | 10 mi ENE | Nearby origin |
| Weyanoke Volunteer Fire Department | 11 mi NNW | Nearby origin |
| Pointe Coupee Fire District 3 - Alma Firehouse | 13 mi S | Potential mutual-aid origin |
| Morganza Volunteer Fire Department | 13 mi WSW | Potential mutual-aid origin |
| West Baton Rouge Fire Station 61 - Rosehill | 13 mi SSE | Potential mutual-aid origin |
| Zachary Fire Rescue Station 82 | 14 mi SE | Potential mutual-aid origin |
Hospitals (30)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| West Feliciana Hospital | 0.9 mi ESE | Not in the public record |
| Pointe Coupee General Hospital | 8.8 mi SSW | Not in the public record |
| Feliciana Forensic Facility | 10 mi ENE | Not in the public record |
| Villa Feliciana Medical Complex | 13 mi ENE | Not in the public record |
| Lane Regional Medical Center | 17 mi SE | Not in the public record |
| Behavioral Hospital of Southeast Louisiana | 25 mi SE | Not in the public record |
| Baton Rouge General Hospital Mid City | 27 mi SSE | Not in the public record |
| Baton Rouge Behavioral Hospital | 27 mi SSE | Not in the public record |
| Field Memorial Community Hospital | 28 mi NE | Not in the public record |
| Baton Rouge Rehabilitation Hospital | 31 mi SSE | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Site location (only a locality point is shown)
- Utility Interconnection agreement: The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for. capacity
- Backup generation and battery/UPS systems
- Local response resources not yet recorded
Changes (4)
- 2026-11-14 New information Hut 8 River Bend: Issuer reports structural steel and foundations completed across four halls and initial campus substation energization; first data-hall delivery remains targeted for Q2 2027. Source: Hut 8 Corp..
- 2026-11-14 New information Hut 8 River Bend: Added Entergy's own statement of the agreement: an initial 330 MW of utility capacity for 245 MW of critical IT load, with operations expected by the second quarter of 2027. Source: Entergy; Hut 8.
- 2026-10-15 Project status Hut 8 River Bend: October 5 on-site reporting describes active River Bend construction; stage changed from proposed to under construction at moderate confidence. Previously: Under development · lease signed Dec 2025; PROPOSED. Source: WAFB. Public submission.
- 2026-09-25 Added to the atlas Hut 8 River Bend: Added to the atlas.
Related data centers
Others in Louisiana
Cite this record
"Hut 8 River Bend", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/hut8-river-bend, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.