Vantage OH1 New Albany

Vantage Data Centers · Licking County, Ohio

Open in the interactive atlas →Company project page ↗

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Under development; current operating phase UNKNOWN
Sourced · fair
Planned campus area
70 acres
Sourced · fair
Planned critical IT lease: A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.
192 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). critical IT load at full buildout
Sourced · fair
Planned cooling system
Closed-loop cooling: A cooling system that recirculates the same water instead of drawing new water continuously. chilled water using air-cooled chillers
Sourced · fair
Facility electrical draw capacity (MW)
Not in the public record

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 5 terms used on this page
IT lease
A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.
Interconnection agreement
The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
UPS (uninterruptible power supply)
Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Closed-loop cooling
A cooling system that recirculates the same water instead of drawing new water continuously.

Profile

Vantage broke ground on its New Albany OH1 campus in October 2024. It describes a 70-acre, three-building plan with 192 MW of critical IT load and names AEP Ohio as power provider. The 192 MW is a planned IT design figure, not the campus's utility draw capacity; completion of the first phase remains unverified here. Sourced · fair

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
Not in the public record
Backup generation
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Primary fire jurisdiction
Not in the public record

Fire and rescue stations (275)

NameStraight-line distanceRole
Plain Township Fire Department3.1 mi WSWNearby origin
Monroe Township Fire Department - Station 5015.2 mi NENearby origin
Harlem Township Division of Fire Station 450
Harlem Township Division Of Fire
5.4 mi NWNearby origin
Jefferson Township Fire Department6.6 mi SSWNearby origin
Columbus Division of Fire Station 29
Columbus Division Of Fire
7.0 mi WNearby origin
Mifflin Township Fire Station 133
Mifflin Township - Division Of Fire
7.1 mi WSWNearby origin
Saint Albans Township Fire Department
St. Albans Township Fire Department
7.2 mi ENearby origin
West Licking Joint Fire District Station 3
West Licking Joint Fire District
7.8 mi SNearby origin
Westerville Division of Fire Station 112
Westerville Division Of Fire
8.1 mi WNearby origin
West Licking Joint Fire District Station 1
West Licking Joint Fire District
8.2 mi SENearby origin

The nearest 10 of 275. See all of them in the atlas →

Hospitals (47)

NameStraight-line distanceEmergency department
Mount Carmel New Albany Surgical Hospital2.5 mi WSWNot in the public record
Mount Carmel East Hospital9.9 mi SSWNot in the public record
OhioHealth Westerville Medical Center11 mi WNWNot in the public record
Mount Carmel Saint Ann's Hospital11 mi WNot in the public record
Columbus Springs East Hospital11 mi SWNot in the public record
Mount Carmel Rehabilitation Hospital11 mi WNWNot in the public record
SUN Behavioral Health-Columbus13 mi WNot in the public record
Mount Carmel Behavioral Health Hospital13 mi SSWNot in the public record
OhioHealth Pickerington Methodist Hospital13 mi SNot in the public record
The Ohio State University Hospitals East15 mi SWNot in the public record

The nearest 10 of 47. See all of them in the atlas →

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Current operating phase and completed building count
  • Electrical draw/Interconnection agreement: The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for. capacity and measured load
  • Installed backup systems, measured water use, and fire response capability

Changes (1)

Related data centers

Others in Ohio

Cite this record

"Vantage OH1 New Albany", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/vantage-oh1-new-albany, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.