Meta Temple Data Center

AI-optimized data center · Bell County, TX

Meta Platforms, Inc. · Off NW H K Dodgen Loop and Industrial Blvd, Temple, TX (city description)

Status Operational · online July 2026 VERIFIED · HIGH Stage: In service
Last checked against its sources Sep 24, 2026

Open in the interactive atlas →Company project page ↗

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Meta's Temple data center began serving traffic in July 2026. It has more than 760,000 ft² in two buildings and more than $1.2 billion of investment, and Meta calls it its first AI-optimized data center to come online. Meta says it planned the site's energy supply with Oncor Electric. VERIFIED · MODERATE

Key facts

Building area
760,000+ ft² (2 buildings)
VERIFIED · HIGH
Announced investment
>$1.2 billion
VERIFIED · HIGH
Site area
393 acres (2022 city figure)
VERIFIED · MODERATE
Electric utility
Oncor (company)
VERIFIED · MODERATE

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (5)

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.