Profile
Meta's Temple data center began serving traffic in July 2026. It has more than 760,000 ft² in two buildings and more than $1.2 billion of investment, and Meta calls it its first AI-optimized data center to come online. Meta says it planned the site's energy supply with Oncor Electric. VERIFIED · MODERATE
Key facts
- Building area
- 760,000+ ft² (2 buildings)
- VERIFIED · HIGH
- Announced investment
- >$1.2 billion
- VERIFIED · HIGH
- Site area
- 393 acres (2022 city figure)
- VERIFIED · MODERATE
- Electric utility
- Oncor (company)
- VERIFIED · MODERATE
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Power capacity (MW)
- UNKNOWN Cooling method and water use (the city's 4,000 gal/day cap applies to a different project)
- UNKNOWN Local response resources not yet recorded
Changes (1)
- 2026-09-24 Added to the atlas Meta Temple Data Center: Added to the atlas.
Sources (5)
- Meta to build new Hyperscale Data Center in Temple
- Data Center Information Hub
- Temple, we are online!
- Meta's Temple Data Center (one-pager)
- DCRA manual location approximation