Applied Digital Delta Forge 1

Applied Digital Corporation · Rapides Parish, Louisiana

Open in the interactive atlas →

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Under construction · ops target mid-2027
Sourced · fair
Campus utility power (initial)
430 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
Sourced · fair
Planned buildings
Two 150 MW facilities
Sourced · fair
Announced investment
$3.6B
Sourced · fair
Site
500+ acres
Sourced · fair

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 3 terms used on this page
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
UPS (uninterruptible power supply)
Batteries that keep computers running through the seconds between a power loss and backup generators starting.
High-investment-grade tenant
A company's way of saying its tenant has a strong credit rating. It does not name the tenant.

Profile

Applied Digital broke ground in January 2026 on Delta Forge 1, a $3.6 billion AI campus in Rapides Parish with 430 MW of initial utility power across two 150 MW buildings on more than 500 acres. Cleco will provide power, operations are targeted for mid-2027, and the company has announced an unnamed investment-grade hyperscaler tenant. Sourced · fair

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules · MISO

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
Not in the public record
Backup generation
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Primary fire jurisdiction
Not in the public record

Fire and rescue stations (125)

NameStraight-line distanceRole
Alexandria Fire Department Administration
City Of Alexandria Fire Department
0.5 mi SSWNearby origin
Pineville Fire Department Station 1
City Of Pineville Fire Department
1.5 mi NENearby origin
Eddie Williams Memorial Fire Station 32.5 mi SSENearby origin
Rapides Parish Fire District 2 Station 1
Rapides Parish Fire District 2
3.4 mi SNearby origin
Pineville Fire Department Station 3
City Of Pineville Fire Department
3.9 mi NENearby origin
City of Pineville Fire Department Station 25.0 mi NNENearby origin
Alpine Volunteer Fire Department Station 3
Alpine Volunteer Fire Department/Rapides Parish Fire District #3
5.1 mi NNWNearby origin
Alpine Volunteer Fire Department Station 2
Alpine Volunteer Fire Department/Rapides Parish Fire District #3
5.2 mi NNENearby origin
Holiday Village Volunteer Fire Department6.8 mi ENENearby origin
Rapides Parish Fire District 2 Station 4
Rapides Parish Fire District 2
6.8 mi WNearby origin

The nearest 10 of 125. See all of them in the atlas →

Hospitals (23)

NameStraight-line distanceEmergency department
Rapides Women's and Children's Hospital0.3 mi NNot in the public record
Rapides Regional Medical Center0.4 mi NNot in the public record
HealthSouth Rehabilitation Hospital of Alexandria0.5 mi NNWNot in the public record
Central Louisiana Surgical Hospital1.1 mi WNWNot in the public record
Christus Dubuis Hospital of Alexandria2.0 mi SSWNot in the public record
Christus Saint Frances Cabrini Hospital2.0 mi SSWNot in the public record
Riverside Hospital of Louisiana2.3 mi WSWNot in the public record
Alexandria Veterans Affairs Medical Center3.2 mi NNENot in the public record
Longleaf Hospital3.5 mi WSWNot in the public record
Avoyelles Hospital26 mi ESENot in the public record

The nearest 10 of 23. See all of them in the atlas →

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Site location (only a parish-level point is shown)
  • Backup generation and battery/UPS systems
  • Local response resources not yet recorded

Changes (1)

Related data centers

Others in Louisiana

Cite this record

"Applied Digital Delta Forge 1", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/applied-digital-delta-forge-1, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.