Applied Digital Delta Forge 1

AI campus · Rapides Parish, LA

Applied Digital Corporation

Status Under construction · ops target mid-2027 VERIFIED · MODERATE
Last checked against its sources Sep 25, 2026

Open in the interactive atlas →

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Applied Digital broke ground in January 2026 on Delta Forge 1, a $3.6 billion AI campus in Rapides Parish with 430 MW of initial utility power across two 150 MW buildings on more than 500 acres. Cleco will provide power, operations are targeted for mid-2027, and the company has announced an unnamed investment-grade hyperscaler tenant. VERIFIED · MODERATE

Key facts

Campus utility power (initial)
430 MW
VERIFIED · MODERATE
Planned buildings
Two 150 MW facilities
VERIFIED · MODERATE
Announced investment
$3.6B
VERIFIED · MODERATE
Site
500+ acres
VERIFIED · MODERATE

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (5)

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.