TeraWulf Morgantown
- Proposed
- Brownfield generation & data center site
- 6 sources
- Last checked Nov 14, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- In development; acquisition pending closing and regulatory approvals
- Sourced · fair
- Existing generation capacity (not facility load)
- ~210 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). operating generation
- Sourced · fair
- Campus area
- Not in the public record
- Backup generation
- Not in the public record
- Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 2 terms used on this page
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Profile
TeraWulf Morgantown is a proposed data center redevelopment of the Morgantown Generating Station brownfield site in Newburg, Charles County, Maryland. TeraWulf agreed to acquire the site in February 2026; its November investor filing still describes acquisition pending closing and regulatory approvals. The facility includes approximately 210 MW of existing operating generation infrastructure, with long-term plans to support up to 1 GW of high-density computing load pending further regulatory approvals. Sourced · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules · PJM
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Battery / UPS system
- Not in the public record
- Backup generation
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Fire jurisdiction
- Not in the public record
Fire and rescue stations (322)
| Name | Straight-line distance | Role |
|---|---|---|
| Newburg Volunteer Rescue Squad and Fire Department | 2.0 mi NE | Nearby origin |
| Naval District Washington Fire Department Dahlgren | 3.7 mi SW | Nearby origin |
| King George Fire and Rescue - Engine Company 2 Dahlgren Station | 4.7 mi WSW | Nearby origin |
| Bel Alton Volunteer Fire Department and Emergency Medical Services | 7.2 mi N | Nearby origin |
| Colonial Beach Volunteer Fire Department Engine Company 1 | 7.2 mi S | Nearby origin |
| Cobb Island Volunteer Fire Department and Emergency Medical Services | 9.7 mi SE | Nearby origin |
| Oak Grove Volunteer Fire Department Engine Company 4 | 12 mi S | Potential mutual-aid origin |
| La Plata Volunteer Fire Department | 13 mi N | Potential mutual-aid origin |
| King George Fire and Rescue - Engine Company 1 Courthouse Station | 13 mi WSW | Potential mutual-aid origin |
| Seventh District Volunteer Fire Department Company 5 | 13 mi ESE | Potential mutual-aid origin |
Hospitals (47)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| University of Maryland Charles Regional Medical Center | 12 mi N | Not in the public record |
| MedStar Saint Mary's Hospital | 19 mi ESE | Not in the public record |
| Stafford Hospital | 23 mi W | Not in the public record |
| Calvert Memorial Hospital | 25 mi NE | Not in the public record |
| Sentara Northern Virginia Medical Center | 25 mi NW | Not in the public record |
| Fort Belvoir Community Hospital | 26 mi NNW | Not in the public record |
| Adventist HealthCare Fort Washington Medical Center | 26 mi N | Not in the public record |
| Inova Mount Vernon Hospital | 27 mi N | Not in the public record |
| Mary Washington Hospital | 27 mi W | Not in the public record |
| Encompass Health Rehabilitation Hospital of Fredericksburg | 28 mi W | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Data center building construction schedule and phase milestones
- State Certificate of Public Convenience and Necessity (CPCN) filings
- Environmental remediation timeline for former coal ash basins
- Anchor tenant commitments
Changes (3)
- 2026-11-14 Permit / regulatory TeraWulf Morgantown: Added FERC's July 2026 order authorizing the transaction without a condition on removing the plant's units from the PJM market. Source: Federal Energy Regulatory Commission (copy hosted by TheBayNet).
- 2026-11-14 Correction TeraWulf Morgantown: Clarified that the acquisition remains pending closing and regulatory approvals in the November issuer filing; an earlier regulatory authorization is not transaction closing. Previously: In development; generation described as acquired with the site. Source: TeraWulf Inc..
- 2026-09-26 Added to the atlas TeraWulf Morgantown: Added to the atlas.
Related data centers
Others in Maryland
Cite this record
"TeraWulf Morgantown", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/terawulf-morgantown, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.