Brookfield Paducah
- Permitting / approvals
- Announced AI / HPC campus
- 5 sources
- Last checked Nov 14, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Announced partnership
- Sourced · strong
- Announced campus scale
- 1.8 GW AI / HPC campus plan
- Sourced · strong
- Planned retail electric provider
- Jackson Purchase Energy Cooperative
- Sourced · strong
- Construction completion target
- 2031
- Sourced · strong
- Approved power capacity ( (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).)
- Not in the public record
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 3 terms used on this page
- IT lease
- A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Profile
DOE announced in July 2026 that Brookfield was selected to develop and operate a data-center campus on portions of the Paducah Site in McCracken County. DOE described a planned 1.8 GW AI/HPC campus and named Jackson Purchase Energy Cooperative for retail electric service, subject to state approval of the power service agreement. The campus footprint, approved draw, and operating status remain unconfirmed. Sourced · strong
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Facility battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
- Facility backup generation
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Primary fire jurisdiction
- Not in the public record
Fire and rescue stations (184)
| Name | Straight-line distance | Role |
|---|---|---|
| Concord Fire Department Station 1 | 2.2 mi NNE | Nearby origin |
| Paducah Fire Department Station 3 | 2.7 mi NE | Nearby origin |
| Lone Oak Fire Department Station 1 | 2.8 mi SE | Nearby origin |
| Lone Oak Fire Department Station 2 | 2.8 mi SSW | Nearby origin |
| Barkely Airport Fire Department | 3.0 mi W | Nearby origin |
| Paducah Fire Department Station 4 | 4.2 mi E | Nearby origin |
| Hendron Fire Department | 4.7 mi ESE | Nearby origin |
| Concord Fire Department Station 2 | 4.8 mi SW | Nearby origin |
| West McCracken Fire Department Station 1 | 5.2 mi NW | Nearby origin |
| Paducah Fire Department Station 5 | 5.5 mi ENE | Nearby origin |
Hospitals (15)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Lourdes Hospital | 3.6 mi E | Not in the public record |
| Baptist Health Paducah | 4.9 mi ENE | Not in the public record |
| Massac Memorial Hospital | 7.9 mi N | Not in the public record |
| Jackson Purchase Medical Center | 21 mi S | Not in the public record |
| Marshall County Hospital | 23 mi SE | Not in the public record |
| Livingston Hospital | 30 mi ENE | Not in the public record |
| Hardin County General Hospital | 32 mi NE | Not in the public record |
| Murray - Calloway County Hospital | 38 mi SE | Not in the public record |
| Union County Hospital | 41 mi NW | Not in the public record |
| Caldwell Medical Center | 44 mi E | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Data-center parcel within the larger DOE site
- Approved power-service capacity and final site design
- Facility backup generation, battery systems, and water use
- Local response resources not yet recorded
Changes (2)
- 2026-11-14 New information Brookfield Paducah: Added DOE's announcement naming Big Rivers and Jackson Purchase Energy Cooperative as the planned power suppliers, with 2 GW of gas generation and up to 2.6 GW of battery storage planned. Source: U.S. Department of Energy, Office of Environmental Management.
- 2026-09-26 Added to the atlas Brookfield Paducah: Added to the atlas.
Related data centers
Others in Kentucky
Cite this record
"Brookfield Paducah", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/brookfield-paducah-doe-site, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.