AWS New Albany
- Partly in service
- Cloud data center campus
- 4 sources
- Last checked Sep 27, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Partly operational; expansion under construction
- Sourced · strong
- AWS Licking County investment, 2015–2024
- $6.2 billion across county infrastructure
- Sourced · strong
- Newest campus phase, August 2025
- Two buildings completed and staffed; remaining facilities under construction
- Sourced · strong
- Facility electrical draw capacity ( (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).)
- Not in the public record
- Confirmed serving utility
- Not in the public record
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 2 terms used on this page
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Profile
AWS has data-center infrastructure in Licking County. In August 2025, the City of New Albany reported that two buildings at its newest campus were constructed and staffed while others remained under construction. The city's $6.2 billion figure covers AWS investment across Licking County from 2015 through 2024, not this campus alone. Sourced · strong
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
- Backup generation
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Fire jurisdiction
- Monroe Township Fire Department (NERIS boundary)
- Calculated · weak
- Jurisdiction department type
- Combination
- Sourced · fair
- Department staffing
- 11 career full-time · 29 volunteer firefighters
- Sourced · fair
- Department stations
- 2 stations
- Sourced · fair
- Services the department lists
- Not in the public record
Fire and rescue stations (275)
| Name | Straight-line distance | Role |
|---|---|---|
| Plain Township Fire Department | 3.1 mi WSW | Nearby origin |
| Monroe Township Fire Department - Station 501 | 5.3 mi NE | Nearby origin |
| Harlem Township Division of Fire Station 450 | 5.7 mi NW | Nearby origin |
| Jefferson Township Fire Department | 6.5 mi SW | Nearby origin |
| Saint Albans Township Fire Department | 7.0 mi E | Nearby origin |
| Mifflin Township Fire Station 133 | 7.1 mi WSW | Nearby origin |
| Columbus Division of Fire Station 29 | 7.2 mi W | Nearby origin |
| West Licking Joint Fire District Station 3 | 7.5 mi S | Nearby origin |
| West Licking Joint Fire District Station 1 | 7.9 mi SE | Nearby origin |
| Westerville Division of Fire Station 112 | 8.3 mi W | Nearby origin |
Hospitals (48)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Mount Carmel New Albany Surgical Hospital | 2.5 mi WSW | Not in the public record |
| Mount Carmel East Hospital | 9.7 mi SSW | Not in the public record |
| Columbus Springs East Hospital | 11 mi WSW | Not in the public record |
| Mount Carmel Saint Ann's Hospital | 11 mi W | Not in the public record |
| OhioHealth Westerville Medical Center | 11 mi WNW | Not in the public record |
| Mount Carmel Rehabilitation Hospital | 11 mi WNW | Not in the public record |
| OhioHealth Pickerington Methodist Hospital | 13 mi S | Not in the public record |
| Mount Carmel Behavioral Health Hospital | 13 mi SSW | Not in the public record |
| SUN Behavioral Health-Columbus | 13 mi W | Not in the public record |
| The Ohio State University Hospitals East | 14 mi SW | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Current phase completion and exact campus footprint
- Facility electrical draw capacity and serving utility
- Backup generation, batteries, cooling, and water use
- Primary fire jurisdiction and response capabilities
Changes (1)
- 2026-09-27 Added to the atlas AWS New Albany: Added to the atlas.
Related data centers
More from Amazon Web Services
Others in Ohio
Cite this record
"AWS New Albany", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/aws-new-albany-oh, last checked Sep 27, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.