Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Operational (as of FY2018 filing)
- Sourced · fair
- Utility power
- 110 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). (Dominion)
- Sourced · fair
- Backup generation
- Diesel generators
- Sourced · fair
- Raised floor
- 500,000+ ft² (path to 1M+)
- Sourced · fair
- Site
- ~220 acres
- Sourced · fair
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 2 terms used on this page
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Profile
QTS's Richmond data center occupies a former semiconductor fab on about 220 acres in White Oak Technology Park, acquired in 2010. QTS's FY2018 10-K describes 110 MW of utility power from Dominion Virginia Power backed by diesel generators and more than 500,000 ft² of raised floor with a path to over 1 million. QTS went private in 2021, so these values are dated. Sourced · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules · PJM
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
- Backup generation
- Diesel generators
- Sourced · fair
Diesel fuel
Verified at facilityQTS's FY2018 10-K states the Richmond facility's utility power is backed up by diesel generators. Generator count and on-site fuel quantity are NOT stated. Sourced · fair
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Fire jurisdiction
- Henrico County Division of Fire (NERIS boundary)
- Calculated · weak
- Jurisdiction department type
- Career
- Sourced · fair
- Department staffing
- 620 career full-time · 0 career part-time · 0 volunteer firefighters
- Sourced · fair
- Department stations
- 26 stations · 208 units
- Sourced · fair
- Services the department lists
- Structural firefighting, Hazmat technician, Hazmat ops (15 services listed in all)
- Sourced · fair
Fire and rescue stations (201)
| Name | Straight-line distance | Role |
|---|---|---|
| Richmond International Airport Fire Department | 0.7 mi W | Nearby origin |
| Henrico County Firehouse 3 | 2.3 mi N | Nearby origin |
| Henrico County Fire Station 14 | 2.7 mi E | Nearby origin |
| Henrico County Firehouse Eastover Gardens Station 6 | 2.8 mi WNW | Nearby origin |
| Henrico County Fire Station 2 | 3.2 mi WSW | Nearby origin |
| Henrico County Firehouse 18 | 4.2 mi SSE | Nearby origin |
| Richmond Fire Department Station 8 | 5.2 mi W | Nearby origin |
| Henrico County Firehouse 4 | 5.2 mi SSW | Nearby origin |
| Richmond Fire Department Station 11 | 5.7 mi WNW | Nearby origin |
| Richmond Fire Department Station 1 | 6.2 mi WNW | Nearby origin |
Hospitals (27)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Bon Secours Richmond Community Hospital | 5.7 mi WNW | Not in the public record |
| Virginia Commonwealth University Medical Center - Main Hospital | 6.9 mi WNW | Not in the public record |
| Richmond Veterans Affairs Medical Center | 8.7 mi W | Not in the public record |
| Children's Hospital of Richmond - Brook Road Campus | 8.8 mi WNW | Not in the public record |
| Memorial Regional Medical Center | 9.2 mi NNW | Not in the public record |
| Retreat Doctors' Hospital | 9.4 mi WNW | Not in the public record |
| Select Specialty Hospital - Richmond | 11 mi WNW | Not in the public record |
| Chippenham Hospital | 12 mi W | Not in the public record |
| Encompass Health Rehabilitation Hospital of Richmond | 12 mi WNW | Not in the public record |
| Saint Mary's Hospital | 12 mi WNW | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Current capacity (values are from the FY2018 10-K; no filings after 2021)
- Generator count, rating, and fuel storage
- Local response resources not yet recorded
Changes (2)
- 2026-11-14 New information QTS Richmond: Added a 2019 description of a 110-megawatt substation at the site. Source: Henrico Economic Development Authority.
- 2026-09-25 Added to the atlas QTS Richmond: Added to the atlas.
Related data centers
More from QTS Data Centers
Others in Virginia
Cite this record
"QTS Richmond", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/qts-richmond, last checked Sep 25, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.