QTS Richmond

Multi-tenant data center · Henrico County, VA

QTS Data Centers

Status Operational (as of FY2018 filing) VERIFIED · MODERATE Stage: In service
Last checked against its sources Sep 25, 2026

Open in the interactive atlas →

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

QTS's Richmond data center occupies a former semiconductor fab on about 220 acres in White Oak Technology Park, acquired in 2010. QTS's FY2018 10-K describes 110 MW of utility power from Dominion Virginia Power backed by diesel generators and more than 500,000 ft² of raised floor with a path to over 1 million. QTS went private in 2021, so these values are dated. VERIFIED · MODERATE

Key facts

Utility power
110 MW (Dominion)
VERIFIED · MODERATE
Backup generation
Diesel generators
VERIFIED · MODERATE
Raised floor
500,000+ ft² (path to 1M+)
VERIFIED · MODERATE
Site
~220 acres
VERIFIED · MODERATE

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (4)