Creekstone Gigasite

AI data center and energy campus · Millard County, UT

Creekstone Energy, LLC

Status Construction began late last year (April 2026 state announcement) VERIFIED · HIGH Stage: Under construction
Last checked against its sources Oct 4, 2026

Open in the interactive atlas →

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Utah awarded Creekstone Energy a post-performance incentive for its planned AI data center and power campus near Delta. The state says construction began in late 2025 and describes a planned $17.08 billion investment over 20 years. Its announcement describes a proposed cooling design without evaporative water use; actual facility draw and water use remain unknown. VERIFIED · HIGH

Key facts

Planned Utah investment
$17.08 billion over 20 years
VERIFIED · HIGH
Proposed cooling approach
No evaporative water use for cooling planned
VERIFIED · MODERATE
Facility electrical draw capacity (MW)
UNKNOWN
UNKNOWN · UNKNOWN
Data-center campus acreage
UNKNOWN
UNKNOWN · UNKNOWN

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (3)