Creekstone Gigasite
AI data center and energy campus · Millard County, UT
Status Construction began late last year (April 2026 state announcement) VERIFIED · HIGH Stage: Under construction
Last checked against its sources Oct 4, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
Utah awarded Creekstone Energy a post-performance incentive for its planned AI data center and power campus near Delta. The state says construction began in late 2025 and describes a planned $17.08 billion investment over 20 years. Its announcement describes a proposed cooling design without evaporative water use; actual facility draw and water use remain unknown. VERIFIED · HIGH
Key facts
- Planned Utah investment
- $17.08 billion over 20 years
- VERIFIED · HIGH
- Proposed cooling approach
- No evaporative water use for cooling planned
- VERIFIED · MODERATE
- Facility electrical draw capacity (MW)
- UNKNOWN
- UNKNOWN · UNKNOWN
- Data-center campus acreage
- UNKNOWN
- UNKNOWN · UNKNOWN
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Exact campus point and data-center acreage
- UNKNOWN Facility electrical draw and any serving utility or interconnection
- UNKNOWN Actual cooling operation, water source, and water use
- UNKNOWN Backup systems, phase completion, and fire-response jurisdiction
Changes (1)
- 2026-10-04 Added to the atlas Creekstone Gigasite: Added to the atlas.
Sources (3)
- State of Utah Incorporated Places - ACS25
- Creekstone Energy, LLC Commits $17 Billion to Millard County Data Center Project
- DCRA manual location approximation