Riot Corsicana Facility

Riot Platforms, Inc. · Navarro County, Texas

Open in the interactive atlas →

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Operational · 400 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). bitcoin mining
Sourced · fair
(Electric Reliability Council of Texas)ERCOT (Electric Reliability Council of Texas): Runs the power grid that serves most of Texas and reviews requests to connect very large new users. It does not own power lines.-approved capacity
1,000 MW approved
Sourced · strong
Energized substation capacity
400 MW (345 (kilovolt)kV (kilovolt): A measure of a power line's voltage. Higher-voltage lines, such as 138 kV or 345 kV, carry more power over longer distances. / 138 kV)
Sourced · strong
Substations energized
April 2024
Sourced · strong
Site area
265 acres
Sourced · strong

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 9 terms used on this page
ERCOT (Electric Reliability Council of Texas)
Runs the power grid that serves most of Texas and reviews requests to connect very large new users. It does not own power lines.
PUCT (Public Utility Commission of Texas)
The state agency that regulates electric utilities, including the rules for who pays for grid equipment.
TCRF (transmission cost recovery factor)
A charge on Texas electric bills that passes changes in transmission costs on to customers, updated twice a year.
SB 6 (Senate Bill 6)
A state law setting rules for very large electricity users, including what they must pay toward their own grid connection.
Interconnection agreement
The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
kV (kilovolt)
A measure of a power line's voltage. Higher-voltage lines, such as 138 kV or 345 kV, carry more power over longer distances.
UPS (uninterruptible power supply)
Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Energization
The first time power flows to a new site from the grid. It comes before full operation.

Profile

Riot's Corsicana Facility is a 265-acre site with 1 GW of ERCOT-approved load. Its 345 kV and 138 kV substations (400 MW) were energized in April 2024 and supply immersion-cooled bitcoin mining. In 2025 Riot halted a second mining phase and began evaluating AI/HPC use for the remaining 600 MW. Sourced · fair

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules · ERCOT, TX

New lines and transmission substations In force
Pays: Electricity users across the grid region. Equipment at 60 kV and above is paid for by electricity users across all of ERCOT, not only nearby. Each transmission utility's approved cost is shared among every distribution utility in ERCOT by its share of the summer peak. Sourced · strongPublic Utility Commission of Texas
On household bills In force
Pays: The utility's customers. Distribution utilities pass changes in those transmission charges on to their customers twice a year. Sourced · strongPublic Utility Commission of Texas
What a large data center pays itself In force
Pays: The data center or its developer. Texas (Senate Bill 6)SB 6 (Senate Bill 6): A state law setting rules for very large electricity users, including what they must pay toward their own grid connection. (2025) requires loads of 75 MW and up (the default threshold) to contribute to the utility's cost of connecting them, pay a screening study fee of at least $100,000, and post financial security for transmission built to serve them. Sourced · strongTexas Legislature
Proposed change Proposed
Pays: Electricity users across the grid region. In July 2026 the (Public Utility Commission of Texas)PUCT (Public Utility Commission of Texas): The state agency that regulates electric utilities, including the rules for who pays for grid equipment. proposed sharing transmission cost by 12 monthly peaks instead of 4 summer ones, with a minimum bill for large loads. Adoption is not confirmed. Sourced · strongPublic Utility Commission of Texas (Texas Register, July 24, 2026)
This facility's share
Unknown How much of any planned line or upgrade a single facility pays is not published; the rules above name no customer.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
Not in the public record
Backup generation
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Primary fire jurisdiction
Not in the public record

Fire and rescue stations (162)

NameStraight-line distanceRole
Mildred Volunteer Fire Department1.9 mi ESENearby origin
Angus Volunteer Fire Department Station 23.7 mi SWNearby origin
Corsicana Fire Department Station 2
Corsicana Fire Department
4.0 mi NWNearby origin
Angus Volunteer Fire Department4.2 mi SSWNearby origin
Navarro Volunteer Fire Department4.3 mi SSENearby origin
Corsicana Fire Department Central Station4.6 mi WNWNearby origin
Retreat Volunteer Fire Department4.7 mi WSWNearby origin
Corsicana Fire Department Station 3
Corsicana Fire Department
5.5 mi WNWNearby origin
Powell Volunteer Fire Department
Navarro County E.S.D. #1 Fire Department
5.9 mi NENearby origin
Corsicana Fire Department Station 4
Corsicana Fire Department
6.2 mi NWNearby origin

The nearest 10 of 162. See all of them in the atlas →

Hospitals (17)

NameStraight-line distanceEmergency department
Navarro Regional Hospital6.3 mi WNWNot in the public record
Ennis Regional Medical Center22 mi NWNot in the public record
Freestone Medical Center27 mi SSENot in the public record
Parkview Regional Hospital27 mi SNot in the public record
UT Health Athens Hospital33 mi ENENot in the public record
Baylor Scott and White Medical Center - Waxahachie37 mi NWNot in the public record
Texas Health Presbyterian Hospital Kaufman37 mi NNot in the public record
Limestone Medical Center37 mi SSWNot in the public record
Hill Regional Hospital41 mi WNot in the public record
Methodist Midlothian Medical Center44 mi NWNot in the public record

The nearest 10 of 17. See all of them in the atlas →

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Immersion fluid type and quantity
  • Future AI/HPC building scope and tenant
  • Local response resources not yet recorded

Changes (2)

Related data centers

Others in Texas

Cite this record

"Riot Corsicana Facility", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/riot-corsicana, last checked Sep 24, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.