Meta Richland Parish (Hyperion)
- Under construction
- AI campus
- 9 sources
- Last checked Nov 14, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Under construction · through 2030
- Sourced · fair
- Planned compute (IT) capacity
- 5 GW planned (IT)
- Sourced · fair
- Announced investment
- >$50B
- Sourced · fair
- Planned floor area
- ~10 million ft²
- Sourced · fair
- Site
- 2,250 acres
- Sourced · fair
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 3 terms used on this page
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- kV (kilovolt)
- A measure of a power line's voltage. Higher-voltage lines, such as 138 kV or 345 kV, carry more power over longer distances.
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Profile
Meta's largest data center, on a 2,250-acre former farm megasite between Rayville and Delhi in Richland Parish. Meta and the state describe more than $50 billion of investment, nearly 10 million square feet, and 5 GW of compute capacity for the Hyperion training cluster, with construction continuing through 2030. Entergy Louisiana is building about 2,260 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). of combined-cycle generation and new 500 (kilovolt)kV (kilovolt): A measure of a power line's voltage. Higher-voltage lines, such as 138 kV or 345 kV, carry more power over longer distances. and 230 kV transmission to serve it. Sourced · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules · MISO
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
- Backup generation
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Primary fire jurisdiction
- Not in the public record
Fire and rescue stations (122)
| Name | Straight-line distance | Role |
|---|---|---|
| Holly Ridge Fire District Station 3 | 2.5 mi W | Nearby origin |
| Holly Ridge Fire District Station 2 | 5.9 mi NNW | Nearby origin |
| Ward One Fire Department Cook Station | 6.1 mi E | Nearby origin |
| Delhi Fire Department | 7.5 mi E | Nearby origin |
| Archibald - Alto Fire Station | 7.6 mi SW | Nearby origin |
| Rayville Fire Department | 8.5 mi WNW | Nearby origin |
| Archibald Alto Fire Station 1 | 10.0 mi WSW | Nearby origin |
| Archibald - Alto Fire Station | 11 mi SW | Nearby origin |
| Holly Ridge Fire District Station 1 | 12 mi N | Nearby origin |
| Mangham Fire District | 13 mi SW | Potential mutual-aid origin |
Hospitals (20)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Delhi Hospital | 7.4 mi E | Not in the public record |
| Richardson Medical Center | 7.7 mi WNW | Not in the public record |
| Franklin Medical Center | 20 mi SSW | Not in the public record |
| Madison Parish Hospital | 26 mi E | Not in the public record |
| Saint Francis North Hospital | 28 mi WNW | Not in the public record |
| Saint Patrick's Psychiatric Hospital | 28 mi WNW | Not in the public record |
| Ochsner LSU Health System Monroe | 28 mi W | Not in the public record |
| Monroe Surgical Hospital | 29 mi WNW | Not in the public record |
| Morehouse General Hospital | 29 mi NW | Not in the public record |
| Saint Francis Medical Center | 29 mi W | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Total facility power draw (only IT capacity is published)
- Backup generation, fuel storage, and battery/UPS systems
- Cooling method and water source
- Local response resources not yet recorded
Changes (2)
- 2026-11-14 New information Meta Richland Parish (Hyperion): Added, as area context, Entergy's open request (LPSC Docket U-37882) to serve a second proposed data center load next to the site, and a reported account of Entergy gas turbines for the data center. Source: Louisiana Public Service Commission; Louisiana Public Service Commission; Louisiana Illuminator.
- 2026-09-25 Added to the atlas Meta Richland Parish (Hyperion): Added to the atlas.
Related data centers
More from Meta Platforms
Others in Louisiana
Cite this record
"Meta Richland Parish (Hyperion)", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/meta-richland-parish, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.