Meta Richland Parish (Hyperion)

AI campus · Richland Parish, LA

Meta Platforms

Status Under construction · through 2030 VERIFIED · MODERATE
Last checked against its sources Sep 25, 2026

Open in the interactive atlas →

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Meta's largest data center, on a 2,250-acre former farm megasite between Rayville and Delhi in Richland Parish. Meta and the state describe more than $50 billion of investment, nearly 10 million square feet, and 5 GW of compute capacity for the Hyperion training cluster, with construction continuing through 2030. Entergy Louisiana is building about 2,260 MW of combined-cycle generation and new 500 kV and 230 kV transmission to serve it. VERIFIED · MODERATE

Key facts

Planned compute (IT) capacity
5 GW planned (IT)
VERIFIED · MODERATE
Announced investment
>$50B
VERIFIED · MODERATE
Planned floor area
~10 million ft²
VERIFIED · MODERATE
Site
2,250 acres
VERIFIED · MODERATE

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (6)

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.