Alcove Project Catalyst
- Permitting / approvals
- Hyperscale data center campus
- 4 sources
- Last checked Nov 14, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Proposed · entitlement work
- Sourced · fair
- Announced campus power capacity
- 500+ (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). proposed
- Sourced · fair
- Announced site area
- 283 acres proposed
- Sourced · fair
- Announced cooling design
- Air-cooled, Closed-loop cooling: A cooling system that recirculates the same water instead of drawing new water continuously. design
- Sourced · fair
- Total investment
- Not in the public record
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 3 terms used on this page
- Interconnection agreement
- The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- Closed-loop cooling
- A cooling system that recirculates the same water instead of drawing new water continuously.
Profile
Osawatomie and Alcove Development announced Project Catalyst as a proposed multi-phase data-center campus on 283 acres within city limits. The joint release describes a 500+ MW campus and an air-cooled design, but also says the project is still moving through entitlement and development planning. The city had earlier described a predevelopment due-diligence phase; no construction start is recorded. Sourced · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Backup generation details
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Fire jurisdiction
- Osawatomie Fire Department (NERIS boundary)
- Calculated · weak
- Jurisdiction department type
- Volunteer
- Sourced · fair
- Department staffing
- 0 career full-time · 20 volunteer firefighters
- Sourced · fair
- Department stations
- 2 stations
- Sourced · fair
- Services the department lists
- Structural firefighting (4 services listed in all)
- Sourced · fair
Fire and rescue stations (245)
| Name | Straight-line distance | Role |
|---|---|---|
| Osawatomie Volunteer Fire Department | 0.3 mi SSW | Nearby origin |
| Paola Fire Department | 6.4 mi NE | Nearby origin |
| Miami County Rural Fire District 1 | 7.9 mi SE | Nearby origin |
| Pottawatomie Township Fire Department Station 1 | 8.4 mi WSW | Nearby origin |
| Cutler Township Fire Department | 8.9 mi WNW | Nearby origin |
| Linn County Rural Fire District 1 Station 940 | 12 mi S | Potential mutual-aid origin |
| Anderson County Rural Fire Station | 13 mi SW | Potential mutual-aid origin |
| Linn Valley Volunteer Fire Department | 15 mi SE | Potential mutual-aid origin |
| La Cygne Volunteer Fire Department | 15 mi SE | Potential mutual-aid origin |
| Lincoln - Ottawa - Harrison Fire District | 16 mi WNW | Potential mutual-aid origin |
Hospitals (42)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Miami County Medical Center | 7.3 mi NE | Not in the public record |
| Ransom Memorial Hospital | 18 mi WNW | Not in the public record |
| Meadowbrook Rehabilitation Hospital | 21 mi N | Not in the public record |
| Anderson County Hospital | 22 mi SW | Not in the public record |
| Olathe Medical Center | 25 mi NNE | Not in the public record |
| Saint Luke's South Hospital | 32 mi NNE | Not in the public record |
| AdventHealth Prairie Star | 32 mi N | Not in the public record |
| Belton Regional Medical Center | 33 mi NE | Not in the public record |
| Overland Park Regional Medical Center | 33 mi NNE | Not in the public record |
| Menorah Medical Center | 33 mi NNE | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Exact parcel, serving utility, Interconnection agreement: The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for. capacity, and construction schedule are not established.
- Water demand, backup generation, and response resources are unknown.
Changes (3)
- 2026-11-14 New information Alcove Project Catalyst: Added the applicant's statement that a substation site is allocated and that electric service will be coordinated through Evergy. Source: Applicant (posted by City of Osawatomie).
- 2026-11-14 Correction Alcove Project Catalyst: Removed the repurposed city news URL from current citations: it now describes a separate 116-acre Northland exploration. Retained the 283-acre Catalyst announcement and existing stage. Previously: ks-catalyst-city-update cited as current Catalyst evidence. Source: City of Osawatomie and Alcove Development.
- 2026-09-28 Added to the atlas Alcove Project Catalyst: Added to the atlas.
Related data centers
Others in Kansas
Cite this record
"Alcove Project Catalyst", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/alcove-project-catalyst, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.