Alcove Project Catalyst

Hyperscale data center campus · Miami County, KS

Alcove Development

Status Proposed · entitlement work VERIFIED · MODERATE Stage: Permitting / approvals
Last checked against its sources Sep 28, 2026

Open in the interactive atlas →Company project page ↗

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Osawatomie and Alcove Development announced Project Catalyst as a proposed multi-phase data-center campus on 283 acres within city limits. The joint release describes a 500+ MW campus and an air-cooled design, but also says the project is still moving through entitlement and development planning. The city had earlier described a predevelopment due-diligence phase; no construction start is recorded. VERIFIED · MODERATE

Key facts

Announced campus power capacity
500+ MW proposed
VERIFIED · MODERATE
Announced site area
283 acres proposed
VERIFIED · MODERATE
Announced cooling design
Air-cooled, closed-loop design
VERIFIED · MODERATE
Total investment
UNKNOWN
UNKNOWN · UNKNOWN

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (4)

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.