Alcove Project Catalyst
Hyperscale data center campus · Miami County, KS
Status Proposed · entitlement work VERIFIED · MODERATE Stage: Permitting / approvals
Last checked against its sources Sep 28, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
Osawatomie and Alcove Development announced Project Catalyst as a proposed multi-phase data-center campus on 283 acres within city limits. The joint release describes a 500+ MW campus and an air-cooled design, but also says the project is still moving through entitlement and development planning. The city had earlier described a predevelopment due-diligence phase; no construction start is recorded. VERIFIED · MODERATE
Key facts
- Announced campus power capacity
- 500+ MW proposed
- VERIFIED · MODERATE
- Announced site area
- 283 acres proposed
- VERIFIED · MODERATE
- Announced cooling design
- Air-cooled, closed-loop design
- VERIFIED · MODERATE
- Total investment
- UNKNOWN
- UNKNOWN · UNKNOWN
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Exact parcel, serving utility, interconnection capacity, and construction schedule are not established.
- UNKNOWN Water demand, backup generation, and response resources are unknown.
Changes (1)
- 2026-09-28 Added to the atlas Alcove Project Catalyst: Added to the atlas.