Alcove Project Catalyst

Alcove Development · Miami County, Kansas

Open in the interactive atlas →Company project page ↗

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Proposed · entitlement work
Sourced · fair
Announced campus power capacity
500+ (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). proposed
Sourced · fair
Announced site area
283 acres proposed
Sourced · fair
Announced cooling design
Air-cooled, Closed-loop cooling: A cooling system that recirculates the same water instead of drawing new water continuously. design
Sourced · fair
Total investment
Not in the public record

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 3 terms used on this page
Interconnection agreement
The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
Closed-loop cooling
A cooling system that recirculates the same water instead of drawing new water continuously.

Profile

Osawatomie and Alcove Development announced Project Catalyst as a proposed multi-phase data-center campus on 283 acres within city limits. The joint release describes a 500+ MW campus and an air-cooled design, but also says the project is still moving through entitlement and development planning. The city had earlier described a predevelopment due-diligence phase; no construction start is recorded. Sourced · fair

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Backup generation details
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Fire jurisdiction
Osawatomie Fire Department (NERIS boundary)
Calculated · weak
Jurisdiction department type
Volunteer
Sourced · fair
Department staffing
0 career full-time · 20 volunteer firefighters
Sourced · fair
Department stations
2 stations
Sourced · fair
Services the department lists
Structural firefighting (4 services listed in all)
Sourced · fair

Fire and rescue stations (245)

NameStraight-line distanceRole
Osawatomie Volunteer Fire Department
Osawatomie Fire Department
0.3 mi SSWNearby origin
Paola Fire Department6.4 mi NENearby origin
Miami County Rural Fire District 1
Miami County Fire District #1
7.9 mi SENearby origin
Pottawatomie Township Fire Department Station 1
Pottawatomie Township Volunteer Fire Department
8.4 mi WSWNearby origin
Cutler Township Fire Department8.9 mi WNWNearby origin
Linn County Rural Fire District 1 Station 940
Linn County Rural Fire District 1
12 mi SPotential mutual-aid origin
Anderson County Rural Fire Station
Anderson County Rural Fire Department
13 mi SWPotential mutual-aid origin
Linn Valley Volunteer Fire Department
Linn Valley Lakes Fpa
15 mi SEPotential mutual-aid origin
La Cygne Volunteer Fire Department
Linn County Rural Fire District 1
15 mi SEPotential mutual-aid origin
Lincoln - Ottawa - Harrison Fire District
Lincoln Ottawa Harrison Volunteer Fire District
16 mi WNWPotential mutual-aid origin

The nearest 10 of 245. See all of them in the atlas →

Hospitals (42)

NameStraight-line distanceEmergency department
Miami County Medical Center7.3 mi NENot in the public record
Ransom Memorial Hospital18 mi WNWNot in the public record
Meadowbrook Rehabilitation Hospital21 mi NNot in the public record
Anderson County Hospital22 mi SWNot in the public record
Olathe Medical Center25 mi NNENot in the public record
Saint Luke's South Hospital32 mi NNENot in the public record
AdventHealth Prairie Star32 mi NNot in the public record
Belton Regional Medical Center33 mi NENot in the public record
Overland Park Regional Medical Center33 mi NNENot in the public record
Menorah Medical Center33 mi NNENot in the public record

The nearest 10 of 42. See all of them in the atlas →

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Exact parcel, serving utility, Interconnection agreement: The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for. capacity, and construction schedule are not established.
  • Water demand, backup generation, and response resources are unknown.

Changes (3)

Related data centers

Others in Kansas

Cite this record

"Alcove Project Catalyst", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/alcove-project-catalyst, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.