QTS Eagle Mountain SLC1
Colocation data center campus · Utah County, UT
Status Third building topped out April 2026 VERIFIED · MODERATE Stage: Under construction
Last checked against its sources Oct 4, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
QTS describes a five-building first phase on approximately 193 acres in Eagle Mountain. Its April 2026 release reports the third building topped out, so construction remains open. QTS states the completed campus is designed for closed-loop cooling without local water draw for cooling; actual facility water use and electrical draw remain unknown. VERIFIED · MODERATE
Key facts
- First-phase site area
- Approximately 193 acres
- VERIFIED · MODERATE
- First-phase building plan
- 5
- VERIFIED · MODERATE
- Planned investment
- $6 billion company plan
- VERIFIED · MODERATE
- Planned cooling approach
- Closed-loop cooling without local water draw for cooling once operational
- VERIFIED · MODERATE
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Exact campus point and confirmed in-service phase
- UNKNOWN Facility draw and serving utility
- UNKNOWN Actual cooling operation and total facility water use
- UNKNOWN Backup systems and fire-response jurisdiction
Changes (1)
- 2026-10-04 Added to the atlas QTS Eagle Mountain SLC1: Added to the atlas.