Meta El Paso Data Center
- Under construction
- Hyperscale campus
- 6 sources
- Last checked Nov 14, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Under construction · 2028 target
- Sourced · fair
- Peak demand committed to the utility
- 1,000 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). by end of 2029 (El Paso Electric filing)
- Sourced · strong
- Planned capacity
- 1,000 MW by 2028 (announced)
- Sourced · strong
- Announced investment
- $10 billion
- Sourced · fair
- Site area
- >1,000 acres reported
- Sourced · fair
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 5 terms used on this page
- ERCOT (Electric Reliability Council of Texas)
- Runs the power grid that serves most of Texas and reviews requests to connect very large new users. It does not own power lines.
- PUCT (Public Utility Commission of Texas)
- The state agency that regulates electric utilities, including the rules for who pays for grid equipment.
- Interconnection agreement
- The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Profile
Meta reports a 1 GW AI data center campus in northeast El Paso targeted to begin coming online in 2028, now developed through a joint venture with BlackRock. Sourced · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
- Backup generation
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Fire jurisdiction
- Not in the public record
Fire and rescue stations (84)
| Name | Straight-line distance | Role |
|---|---|---|
| El Paso Fire Department Station 30 | 1.0 mi NW | Nearby origin |
| El Paso Fire Department Station 28 | 1.4 mi E | Nearby origin |
| El Paso Fire Department Station 21 | 2.5 mi SSE | Nearby origin |
| El Paso Fire Department Station 34 | 2.8 mi E | Nearby origin |
| El Paso Fire Department Station 23 | 3.2 mi SSE | Nearby origin |
| El Paso Fire Department Station 16 | 5.3 mi S | Nearby origin |
| Doña Ana County Fire and Rescue Station 9 - Chaparral | 7.8 mi NNE | Nearby origin |
| Farsouth Volunteer Fire Department | 7.9 mi NNE | Nearby origin |
| El Paso Fire Department Station 27 | 8.3 mi SW | Nearby origin |
| El Paso Fire Department Station 12 | 8.6 mi S | Nearby origin |
Hospitals (20)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| El Paso Long Term Acute Care Hospital | 10 mi SSW | Not in the public record |
| Las Palmas Rehabilitation Hospital | 11 mi SSW | Not in the public record |
| Kindred Hospital El Paso | 11 mi SSW | Not in the public record |
| University Medical Center of El Paso | 11 mi S | Not in the public record |
| El Paso Psychiatric Center | 11 mi S | Not in the public record |
| Hospitals of Providence - Sierra Campus | 11 mi SSW | Not in the public record |
| Mesa Hills Specialty Hospital | 12 mi SSW | Not in the public record |
| The Hospitals of Providence Children’s Hospital | 12 mi SSW | Not in the public record |
| Las Palmas Medical Center | 12 mi SSW | Not in the public record |
| Peak Behavioral Health | 13 mi WSW | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Local response resources not yet recorded
Changes (2)
- 2026-11-02 New information Meta El Paso Data Center: Added El Paso Electric's filing that Meta's subsidiary committed to 1,000 MW of peak demand by the end of 2029, with the first ~220 MW from existing resources and transmission not projected before 2028, and TCEQ's standard permit for on-site generating units. Source: El Paso Electric Company, filed at the PUCT; El Paso Electric Company, filed at the PUCT; Texas Commission on Environmental Quality (TCEQ).
- 2026-09-23 Added to the atlas Meta El Paso Data Center: Added to the atlas.
Related data centers
Others in Texas
Cite this record
"Meta El Paso Data Center", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/meta-el-paso, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.