Meta El Paso Data Center
Hyperscale campus · El Paso County, TX
Status Under construction · 2028 target VERIFIED · MODERATE
Last checked against its sources Sep 23, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
Meta reports a 1 GW AI data center campus in northeast El Paso targeted to begin coming online in 2028, now developed through a joint venture with BlackRock. VERIFIED · MODERATE
Key facts
- Planned capacity
- 1,000 MW by 2028 (announced)
- VERIFIED · HIGH
- Announced investment
- $10 billion
- VERIFIED · MODERATE
- Site area
- >1,000 acres reported
- VERIFIED · MODERATE
- Battery / UPS system
- UNKNOWN
- UNKNOWN · UNKNOWN
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Local response resources not yet recorded
Changes (1)
- 2026-09-23 Added to the atlas Meta El Paso Data Center: Added to the atlas.
Sources (3)