Meta El Paso Data Center

Hyperscale campus · El Paso County, TX

Meta Platforms, Inc. (JV with BlackRock)

Status Under construction · 2028 target VERIFIED · MODERATE
Last checked against its sources Sep 23, 2026

Open in the interactive atlas →

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Meta reports a 1 GW AI data center campus in northeast El Paso targeted to begin coming online in 2028, now developed through a joint venture with BlackRock. VERIFIED · MODERATE

Key facts

Planned capacity
1,000 MW by 2028 (announced)
VERIFIED · HIGH
Announced investment
$10 billion
VERIFIED · MODERATE
Site area
>1,000 acres reported
VERIFIED · MODERATE
Battery / UPS system
UNKNOWN
UNKNOWN · UNKNOWN

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (3)

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.