Meta Eagle Mountain Expansion

Hyperscale data center expansion · Utah County, UT

Meta Platforms, Inc.

Status Existing campus operating; new expansion announced VERIFIED · MODERATE Stage: Partly in service
Last checked against its sources Oct 4, 2026

Open in the interactive atlas →Company project page ↗

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Meta announced a new expansion of its existing Eagle Mountain Data Center in September 2026, bringing stated total Utah investment above $3 billion. Meta says the new buildings will use closed-loop liquid and dry cooling without operational water use in the cooling system, while other on-site uses remain. Expansion acreage, electrical draw, and completion timing are not established. VERIFIED · MODERATE

Key facts

Total Utah investment with expansion
More than $3 billion
VERIFIED · MODERATE
New-building cooling plan
Closed-loop liquid cooling with dry cooling; no operational cooling-system water use planned
VERIFIED · MODERATE
Facility electrical draw capacity (MW)
UNKNOWN
UNKNOWN · UNKNOWN
Expansion acreage
UNKNOWN
UNKNOWN · UNKNOWN

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (3)