Antelope Data Center

Pronghorn Development, LLC · Iron County, Utah

Open in the interactive atlas →

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Conditional-use permit approved June 4, 2026; later permits unresolved
Sourced · strong
Proposed site area
640 acres
Sourced · strong
Proposed data-center buildings
5
Sourced · strong
Proposed on-site generation at full buildout
Up to 1,500 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). natural-gas generation
Sourced · strong
Facility electrical draw capacity (MW)
Not in the public record

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 1 terms used on this page
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).

Profile

Iron County listed Pronghorn Development's Antelope Data Center conditional-use application for a 640-acre site. The June 2026 agenda describes five proposed data-center buildings and an on-site natural-gas power plant scalable to 1,500 MW at full buildout. Approved June 4 minutes record the conditional-use permit grant with amended conditions. Generation is not facility draw; construction and later permits remain unconfirmed. Sourced · strong

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Backup generation
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Primary fire jurisdiction
Not in the public record

Fire and rescue stations (36)

NameStraight-line distanceRole
Cedar City Fire Department Station 3
Cedar City Fire Department
18 mi SEPotential mutual-aid origin
Cedar City Fire Department Station 2
Cedar City Fire Department
18 mi SEPotential mutual-aid origin
Color County Interagency Fire Center19 mi SEPotential mutual-aid origin
Cedar City Fire Department Station 1
Cedar City Fire Department
20 mi SEPotential mutual-aid origin
Hamblin Valley Fire and Rescue21 mi SWPotential mutual-aid origin
Newcastle Fire Department
Newcastle Volunteer Fire Department
21 mi SWPotential mutual-aid origin
Beryl Fire Department23 mi SWPotential mutual-aid origin
Beaver County Fire District 2 - Circle 4 Station25 mi NNEPotential mutual-aid origin
Parowan Fire Department
Parowan Volunteer Fire Department
26 mi EPotential mutual-aid origin
Kanarraville Fire Department27 mi SSEPotential mutual-aid origin

The nearest 10 of 36. See all of them in the atlas →

Hospitals (4)

NameStraight-line distanceEmergency department
Cedar City Hospital20 mi SENot in the public record
Milford Valley Memorial Hospital38 mi NNENot in the public record
Beaver Valley Hospital45 mi NENot in the public record
Garfield Memorial Hospital48 mi ENot in the public record

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Later state and building permits, and construction start
  • Facility draw, utility service, and phase schedule
  • Cooling method, water source, and actual water use
  • Backup systems and fire-response jurisdiction

Changes (3)

Related data centers

Others in Utah

Cite this record

"Antelope Data Center", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/antelope-iron-county, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.