Antelope Data Center
Proposed data center campus · Iron County, UT
Status Conditional-use application in county review record VERIFIED · HIGH Stage: Permitting / approvals
Last checked against its sources Oct 4, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
Iron County listed Pronghorn Development's Antelope Data Center conditional-use application for a 640-acre site. The June 2026 agenda describes five proposed data-center buildings and an on-site natural-gas power plant scalable to 1,500 MW at full buildout. That generation figure is not confirmed facility draw, and the reviewed primary pages do not establish construction. VERIFIED · HIGH
Key facts
- Proposed site area
- 640 acres
- VERIFIED · HIGH
- Proposed data-center buildings
- 5
- VERIFIED · HIGH
- Proposed on-site generation at full buildout
- Up to 1,500 MW natural-gas generation
- VERIFIED · HIGH
- Facility electrical draw capacity (MW)
- UNKNOWN
- UNKNOWN · UNKNOWN
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Final permit disposition and construction start
- UNKNOWN Facility draw, utility service, and phase schedule
- UNKNOWN Cooling method, water source, and actual water use
- UNKNOWN Backup systems and fire-response jurisdiction
Changes (1)
- 2026-10-04 Added to the atlas Antelope Data Center: Added to the atlas.
Sources (4)
- Iron County Planning Commission June 4, 2026 agenda
- Proposed Data Center Information
- State of Utah Counties - 2020 Census
- DCRA manual location approximation