Rowan Bauxite Campus

Rowan Digital Infrastructure / Quinbrook Infrastructure Partners · Frederick County, Maryland

Open in the interactive atlas →Company project page ↗

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Under construction
Sourced · fair
Planned utility load
626 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). planned utility load across three phases
Sourced · fair
Campus area
Not in the public record
Backup generation
Not in the public record
Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
Not in the public record

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 3 terms used on this page
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
UPS (uninterruptible power supply)
Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Energization
The first time power flows to a new site from the grid. It comes before full operation.

Profile

Rowan Bauxite is a multi-phase hyperscale data center campus situated within the Quantum Frederick industrial park in Frederick County, Maryland. Developed by Rowan Digital Infrastructure (backed by Quinbrook Infrastructure Partners and Blackstone), the campus is planned for approximately 626 MW of utility load across three phases. Bauxite I was delivered in 2025 and leased to Amazon Data Services, with subsequent phases in development. Sourced · fair

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules · PJM

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Battery / UPS system
Not in the public record
Backup generation
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Fire jurisdiction
Frederick County Division Of Fire And Rescue Services (NERIS boundary)
Calculated · weak
Jurisdiction department type
Combination
Sourced · fair
Department staffing
600 career full-time · 0 career part-time · 802 volunteer firefighters
Sourced · fair
Department stations
30 stations · 437 units
Sourced · fair
Services the department lists
Hazmat technician, Hazmat ops, Structural firefighting (21 services listed in all)
Sourced · fair

Fire and rescue stations (500)

NameStraight-line distanceRole
Carroll Manor Fire Company Station 14
Frederick County Division Of Fire And Rescue Services
1.6 mi WSWNearby origin
United - Westview Fire Station 23
Frederick County Division Of Fire And Rescue Services
4.6 mi NNENearby origin
Urbana Volunteer Fire and Rescue Company Station 23
Frederick County Division Of Fire And Rescue Services
4.9 mi ENearby origin
Carroll Manor Fire Company Station 28
Frederick County Division Of Fire And Rescue Services
5.0 mi WSWNearby origin
Jefferson Volunteer Fire and Rescue Station 20
Frederick County Division Of Fire And Rescue Services
5.3 mi WNWNearby origin
United Steam Fire Company Station 3
Frederick County Division Of Fire And Rescue Services
6.7 mi NNENearby origin
Citizen Truck Company Station 4
Frederick County Division Of Fire And Rescue Services
6.8 mi NNENearby origin
Junior Fire Company Station 2
Frederick County Division Of Fire And Rescue Services
7.4 mi NNENearby origin
Braddock Heights Volunteer Fire Company Station 12
Frederick County Division Of Fire And Rescue Services
7.5 mi NNWNearby origin
Independent Hose Company Station 1
Frederick County Division Of Fire And Rescue Services
7.5 mi NNearby origin

The nearest 10 of 500. See all of them in the atlas →

Hospitals (88)

NameStraight-line distanceEmergency department
Frederick Health Hospital7.4 mi NNENot in the public record
Holy Cross Germantown Hospital15 mi SENot in the public record
Inova Loudoun Hospital17 mi SNot in the public record
Adventist Healthcare Shady Grove Medical Center20 mi SENot in the public record
Jefferson Medical Center22 mi WNot in the public record
Medstar Montgomery Medical Center24 mi ESENot in the public record
Meritus Medical Center25 mi NNWNot in the public record
Reston Hospital Center25 mi SNot in the public record
Martinsburg Veterans Affairs Medical Center26 mi WNWNot in the public record
Brook Lane Hospital26 mi NNWNot in the public record

The nearest 10 of 88. See all of them in the atlas →

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Energization: The first time power flows to a new site from the grid. It comes before full operation. timeline for Phases II and III
  • On-site generator inventory and permitted emissions limits
  • Cooling architecture and peak water requirements

Changes (2)

Related data centers

Others in Maryland

Cite this record

"Rowan Bauxite Campus", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/rowan-bauxite, last checked Sep 26, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.