Stargate Milam County (SB Energy)
- Under construction
- AI campus
- 8 sources
- Last checked Nov 14, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Under construction (SB Energy)
- Sourced · fair
- Current reconciled campus capacity
- Not in the public record
- Planned site capacity
- 1,200 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). earlier announcement; current scope unresolved
- Sourced · strong
- Filed building scope (Phase 1)
- 548,950 ft² · 4 Data hall delivery: When finished computer rooms are handed over to the tenant.
- Sourced · fair
- Filed estimated cost (Phase 1)
- ~$470 million
- Sourced · fair
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 7 terms used on this page
- ERCOT (Electric Reliability Council of Texas)
- Runs the power grid that serves most of Texas and reviews requests to connect very large new users. It does not own power lines.
- TDLR (Texas Department of Licensing and Regulation)
- The state agency where building projects register for accessibility review. A registration lists a building's size, estimated cost, and planned dates; it does not show that permits were issued or work was done.
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- kV (kilovolt)
- A measure of a power line's voltage. Higher-voltage lines, such as 138 kV or 345 kV, carry more power over longer distances.
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
- Energization
- The first time power flows to a new site from the grid. It comes before full operation.
- Data hall delivery
- When finished computer rooms are handed over to the tenant.
Profile
OpenAI selected SB Energy to build and operate its 1.2 GW Stargate site in Milam County, designed to minimize water use and supported by new generation SB Energy plans to build. A (Texas Department of Licensing and Regulation)TDLR (Texas Department of Licensing and Regulation): The state agency where building projects register for accessibility review. A registration lists a building's size, estimated cost, and planned dates; it does not show that permits were issued or work was done. registration for the first phase ('Freebird') is reported at 548,950 ft² with four data halls and an estimated cost of about $470 million. SB Energy now labels Milam under construction; its approximately 750 MW listing is not reconciled with the earlier 1,200 MW announcement. Sourced · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
- Backup generation
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Fire jurisdiction
- Cameron Volunteer Fire Department (NERIS boundary)
- Calculated · weak
- Jurisdiction department type
- Combination
- Sourced · fair
- Department staffing
- 31 volunteer firefighters
- Sourced · fair
- Department stations
- 1 station · 9 units
- Sourced · fair
- Services the department lists
- Hazmat ops, Structural firefighting (9 services listed in all)
- Sourced · fair
Fire and rescue stations (143)
| Name | Straight-line distance | Role |
|---|---|---|
| Burlington Volunteer Fire Department | 4.4 mi NNW | Nearby origin |
| Cameron Volunteer Fire Department | 6.9 mi S | Nearby origin |
| Rosebud Volunteer Fire Department | 8.0 mi N | Nearby origin |
| Bocholts Volunteer Fire Department | 11 mi WSW | Nearby origin |
| Minerva Volunteer Fire Department | 14 mi S | Potential mutual-aid origin |
| Westphalia Fire Department | 14 mi NW | Potential mutual-aid origin |
| Rogers Volunteer Fire Department First Responders | 16 mi W | Potential mutual-aid origin |
| Calvert Volunteer Fire Department | 17 mi E | Potential mutual-aid origin |
| Lott Volunteer Fire Department | 18 mi NNW | Potential mutual-aid origin |
| Milano Volunteer Fire Department | 18 mi SSE | Potential mutual-aid origin |
Hospitals (22)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Little River Healthcare Rockdale Hospital | 22 mi S | Not in the public record |
| Temple Rehabilitation Hospital | 24 mi WNW | Not in the public record |
| Olin E Teague Veterans Affairs Medical Center | 24 mi WNW | Not in the public record |
| Baylor Scott and White Medical Center - Temple | 25 mi WNW | Not in the public record |
| Baylor Scott and White McLane Children's Medical Center - Temple | 26 mi WNW | Not in the public record |
| Baylor Scott and White Continuing Care Hospital - Temple | 28 mi WNW | Not in the public record |
| Cedar Crest Hospital and Residential Treatment Center | 31 mi W | Not in the public record |
| Saint Joseph Health-Burleson Hospital | 34 mi SSE | Not in the public record |
| Baylor Scott and White Medical Center Taylor | 37 mi SW | Not in the public record |
| Hillcrest Medical Center | 38 mi NNW | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Generation type and grid connection
- Cooling method and water source
- Local response resources not yet recorded
Changes (3)
- 2026-11-02 New information Stargate Milam County (SB Energy): Added SB Energy's filed power phases (about 660 MW of initial load, August 2026 to February 2027, fed at 345 kV from its Orion solar projects) and 753 MW of leased IT capacity. Company targets, not confirmed energization. Source: SB Energy, Inc. (SEC EDGAR).
- 2026-10-15 Project status Stargate Milam County (SB Energy): SB Energy now identifies Milam as under construction; current capacity scope remains unresolved against the earlier 1,200 MW announcement. Previously: Under development · Phase 1 filed with TDLR; PERMITTING. Source: SB Energy; Texas Economic Development Corporation. Public submission.
- 2026-09-24 Added to the atlas Stargate Milam County (SB Energy): Added to the atlas.
Related data centers
Others in Texas
Cite this record
"Stargate Milam County (SB Energy)", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/stargate-milam, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.