Sabey SDC Austin

Sabey Data Centers · Williamson County, Texas

Open in the interactive atlas →Company project page ↗

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Building A complete; Building B under construction
Sourced · fair
Announced Building B power capacity
54 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
Sourced · fair
Building B site-permit scope
255,000 ft²
Sourced · strong
Building B first-tranche target
Late 2027
Sourced · fair
Confirmed campus electrical draw capacity (MW)
Not in the public record

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 3 terms used on this page
IT lease
A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.
Interconnection agreement
The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).

Profile

Sabey's first Round Rock building was complete in fall 2024. The company says its second building remained under construction in Q2 2026 and markets 54 MW of total power capacity for that building, with an initial 18 MW tranche targeted for late 2027. These are development and design statements, not measured operating load. Sourced · fair

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

No battery, UPS, backup-generation, or fuel details are in the public record for this facility yet.

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Primary fire-response jurisdiction
Not in the public record

Fire and rescue stations (232)

NameStraight-line distanceRole
Round Rock Fire Department Station 4
Round Rock Fire Department
0.7 mi NNearby origin
Travis County Emergency Services District Number 2 / Pflugerville Fire Department Station 4
Travis County Emergency Services District No. 2
1.5 mi SSENearby origin
Round Rock Fire Department Station 32.0 mi WNearby origin
Round Rock Fire Station 8
Round Rock Fire Department
2.3 mi ENENearby origin
Round Rock Fire Department Station 2
Round Rock Fire Department
2.4 mi NWNearby origin
Travis County ESD Number 2 / Pflugerville Fire Department Station 5
Travis County Emergency Services District No. 2
2.4 mi SNearby origin
Round Rock Fire Department Station 6
Round Rock Fire Department
2.5 mi NNearby origin
Travis County Emergency Services District Number 2 Pflugerville Fire Department Station 2
Travis County Emergency Services District No. 2
3.1 mi SWNearby origin
Round Rock Fire Department Station 5
Round Rock Fire Department
3.4 mi WNWNearby origin
Pflugerville Fire Department Station 1
Travis County Emergency Services District No. 2
3.8 mi SSENearby origin

The nearest 10 of 232. See all of them in the atlas →

Hospitals (40)

NameStraight-line distanceEmergency department
Baylor Scott and White Medical Center - Pflugerville4.2 mi SENot in the public record
Saint David's Round Rock Medical Center4.3 mi WNWNot in the public record
Ascension Seton Williamson Hospital5.5 mi NNot in the public record
Baylor Scott and White Medical Center Round Rock5.7 mi NNWNot in the public record
Saint David's North Austin Medical Center6.3 mi SSWNot in the public record
Ascension Seton Northwest Hospital8.1 mi SWNot in the public record
Georgetown Behavioral Health Institute9.0 mi NNWNot in the public record
Saint David's Georgetown Hospital9.9 mi NNWNot in the public record
Ascension Seton Cedar Park Hospital10 mi WNWNot in the public record
Northwest Hills Surgical Hospital11 mi SSWNot in the public record

The nearest 10 of 40. See all of them in the atlas →

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Executed electric service terms, actual campus draw, and named serving utility
  • Building B completion and actual first service date
  • Building B generator count and site-specific TCEQ authorization
  • Measured water use by building and site-specific response resources

Changes (1)

Related data centers

Others in Texas

Cite this record

"Sabey SDC Austin", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/sabey-sdc-austin-round-rock, last checked Oct 1, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.