Sabey SDC Austin

Expanding colocation campus · Williamson County, TX

Sabey Data Centers · 1300 Louis Henna Blvd, Round Rock, TX 78664

Status Building A complete; Building B under construction VERIFIED · MODERATE Stage: Partly in service
Last checked against its sources Oct 1, 2026

Open in the interactive atlas →Company project page ↗

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Sabey's first Round Rock building was complete in fall 2024. The company says its second building remained under construction in Q2 2026 and markets 54 MW of total power capacity for that building, with an initial 18 MW tranche targeted for late 2027. These are development and design statements, not measured operating load. VERIFIED · MODERATE

Key facts

Announced Building B power capacity
54 MW
VERIFIED · MODERATE
Building B site-permit scope
255,000 ft²
VERIFIED · HIGH
Building B first-tranche target
Late 2027
VERIFIED · MODERATE
Confirmed campus electrical draw capacity (MW)
UNKNOWN
UNKNOWN · UNKNOWN

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (7)