TeraWulf Inc.

Status Development VERIFIED · MODERATE Stage: Proposed
Last checked against its sources Sep 26, 2026

Open in the interactive atlas →

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

TeraWulf announced acquisition of a former Hawesville industrial site with approximately 480 MW of existing power availability and more than 250 buildable acres. In July 2026, it announced an Anthropic lease for approximately 401 MW of critical IT load, with initial service targeted for the second half of 2027 and full ramp by early 2028. Its August filing notes an on-site energized substation and transmission access; none of these figures is current consumption. VERIFIED · MODERATE

Key facts

Gross site power availability
Up to 480 MW gross power availability
VERIFIED · MODERATE
Leased critical IT capacity
~401 MW leased to Anthropic
VERIFIED · MODERATE
Buildable land
More than 250 buildable acres
VERIFIED · MODERATE
Serving utility
UNKNOWN
UNKNOWN · UNKNOWN

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.