TeraWulf Justified Data
AI / HPC data center campus · Hancock County, KY
Status Development VERIFIED · MODERATE Stage: Proposed
Last checked against its sources Sep 26, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
TeraWulf announced acquisition of a former Hawesville industrial site with approximately 480 MW of existing power availability and more than 250 buildable acres. In July 2026, it announced an Anthropic lease for approximately 401 MW of critical IT load, with initial service targeted for the second half of 2027 and full ramp by early 2028. Its August filing notes an on-site energized substation and transmission access; none of these figures is current consumption. VERIFIED · MODERATE
Key facts
- Gross site power availability
- Up to 480 MW gross power availability
- VERIFIED · MODERATE
- Leased critical IT capacity
- ~401 MW leased to Anthropic
- VERIFIED · MODERATE
- Buildable land
- More than 250 buildable acres
- VERIFIED · MODERATE
- Serving utility
- UNKNOWN
- UNKNOWN · UNKNOWN
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Exact campus point and confirmed construction progress
- UNKNOWN Named serving utility and physical transmission route
- UNKNOWN Backup generation, battery systems, and facility water use
- UNKNOWN Local response resources not yet recorded
Changes (1)
- 2026-09-26 Added to the atlas TeraWulf Justified Data: Added to the atlas.