Vantage Frontier (Stargate Shackelford County)

Vantage Data Centers; Oracle / OpenAI (Stargate) · Shackelford County, Texas

Open in the interactive atlas →Company project page ↗

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Under construction · first building 2H 2026 target
Sourced · fair
Planned critical IT
1,400 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). (IT lease: A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.)
Sourced · strong
Campus footprint
1,200 acres announced
Sourced · strong
Announced investment
>$25 billion
Sourced · strong
Cooling approach
Liquid cooling (company)
Sourced · fair

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 4 terms used on this page
IT lease
A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
UPS (uninterruptible power supply)
Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Fire flow
How much water the local water system can deliver to fight a fire at a site, and for how long.

Profile

Vantage announced Frontier, a 1,200-acre campus in Shackelford County planned for 1.4 GW of critical IT across ten single-story buildings (3.7 million ft²), with more than $25 billion of investment and liquid cooling. OpenAI named the site part of Stargate with Oracle. The first building was targeted for the second half of 2026. Sourced · fair

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
Not in the public record
Backup generation
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Primary fire jurisdiction
Not in the public record

Fire and rescue stations (47)

NameStraight-line distanceRole
Albany Volunteer Fire Department1.8 mi ENearby origin
Lueders Volunteer Fire Department18 mi WNWPotential mutual-aid origin
Hamby Volunteer Fire Department
Hamby Volunteer Fire Department, Inc.
23 mi SWPotential mutual-aid origin
Baird Volunteer Fire Department24 mi SPotential mutual-aid origin
Clyde Volunteer Fire Department25 mi SSWPotential mutual-aid origin
Breckenridge Fire Department25 mi EPotential mutual-aid origin
Woodson Fire Department25 mi NEPotential mutual-aid origin
Putnam Volunteer Fire Department26 mi SSEPotential mutual-aid origin
Abilene Fire Department Station 5
Abilene Fire Department
28 mi SWPotential mutual-aid origin
Abilene Fire Department Station 4
Abilene Fire Department
29 mi SWPotential mutual-aid origin

The nearest 10 of 47. See all of them in the atlas →

Hospitals (7)

NameStraight-line distanceEmergency department
Stephens Memorial Hospital26 mi ENot in the public record
Hendrick Medical Center29 mi SWNot in the public record
Throckmorton County Memorial Hospital33 mi NNENot in the public record
Hendrick Medical Center South34 mi SWNot in the public record
Eastland Memorial Hospital37 mi SENot in the public record
Haskell Memorial Hospital38 mi NWNot in the public record
Graham Regional Medical Center50 mi ENENot in the public record

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Site location within the county (only a county-level point is shown)
  • Power supply: grid connection vs. on-site generation
  • Water source for cooling and Fire flow: How much water the local water system can deliver to fight a fire at a site, and for how long.
  • Local response resources not yet recorded

Changes (3)

Related data centers

Others in Texas

Cite this record

"Vantage Frontier (Stargate Shackelford County)", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/vantage-frontier, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.