Vantage Frontier (Stargate Shackelford County)
- Under construction
- AI campus
- 7 sources
- Last checked Nov 14, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Under construction · first building 2H 2026 target
- Sourced · fair
- Planned critical IT
- 1,400 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). (IT lease: A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.)
- Sourced · strong
- Campus footprint
- 1,200 acres announced
- Sourced · strong
- Announced investment
- >$25 billion
- Sourced · strong
- Cooling approach
- Liquid cooling (company)
- Sourced · fair
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 4 terms used on this page
- IT lease
- A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
- Fire flow
- How much water the local water system can deliver to fight a fire at a site, and for how long.
Profile
Vantage announced Frontier, a 1,200-acre campus in Shackelford County planned for 1.4 GW of critical IT across ten single-story buildings (3.7 million ft²), with more than $25 billion of investment and liquid cooling. OpenAI named the site part of Stargate with Oracle. The first building was targeted for the second half of 2026. Sourced · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
- Backup generation
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Primary fire jurisdiction
- Not in the public record
Fire and rescue stations (47)
| Name | Straight-line distance | Role |
|---|---|---|
| Albany Volunteer Fire Department | 1.8 mi E | Nearby origin |
| Lueders Volunteer Fire Department | 18 mi WNW | Potential mutual-aid origin |
| Hamby Volunteer Fire Department | 23 mi SW | Potential mutual-aid origin |
| Baird Volunteer Fire Department | 24 mi S | Potential mutual-aid origin |
| Clyde Volunteer Fire Department | 25 mi SSW | Potential mutual-aid origin |
| Breckenridge Fire Department | 25 mi E | Potential mutual-aid origin |
| Woodson Fire Department | 25 mi NE | Potential mutual-aid origin |
| Putnam Volunteer Fire Department | 26 mi SSE | Potential mutual-aid origin |
| Abilene Fire Department Station 5 | 28 mi SW | Potential mutual-aid origin |
| Abilene Fire Department Station 4 | 29 mi SW | Potential mutual-aid origin |
Hospitals (7)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Stephens Memorial Hospital | 26 mi E | Not in the public record |
| Hendrick Medical Center | 29 mi SW | Not in the public record |
| Throckmorton County Memorial Hospital | 33 mi NNE | Not in the public record |
| Hendrick Medical Center South | 34 mi SW | Not in the public record |
| Eastland Memorial Hospital | 37 mi SE | Not in the public record |
| Haskell Memorial Hospital | 38 mi NW | Not in the public record |
| Graham Regional Medical Center | 50 mi ENE | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Site location within the county (only a county-level point is shown)
- Power supply: grid connection vs. on-site generation
- Water source for cooling and Fire flow: How much water the local water system can deliver to fight a fire at a site, and for how long.
- Local response resources not yet recorded
Changes (3)
- 2026-11-02 New information Vantage Frontier (Stargate Shackelford County): Added VoltaGrid's gas generation permits in Shackelford County (709 MW standard permit; a pending larger plant whose power the applicant says goes to a nearby data center). The permits do not name Vantage or Frontier. Source: Texas Commission on Environmental Quality (TCEQ); Texas Commission on Environmental Quality (TCEQ).
- 2026-10-28 New information Vantage Frontier (Stargate Shackelford County): Added the direct company campus page corroborating the existing 1,200-acre and ten-building program. Source: Vantage Data Centers. Public submission.
- 2026-09-24 Added to the atlas Vantage Frontier (Stargate Shackelford County): Added to the atlas.
Related data centers
Others in Texas
Cite this record
"Vantage Frontier (Stargate Shackelford County)", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/vantage-frontier, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.