Quantum Frederick
Master-planned data center campus · Frederick County, MD
Status In development VERIFIED · MODERATE Stage: Under construction
Last checked against its sources Sep 26, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
Quantum Frederick is a 2,100-acre master-planned data center community on the former Alcoa Eastalco aluminum smelter site in Adamstown, Maryland. The developer describes a fiber link (QLoop) to Northern Virginia. Horizontal infrastructure and sub-parcel developments are underway with multiple hyperscale operators. VERIFIED · MODERATE
Key facts
- Campus power capacity (MW)
- UNKNOWN
- UNKNOWN · UNKNOWN
- Campus area
- 2,100+ acres (former Alcoa Eastalco Works)
- VERIFIED · HIGH
- Backup generation
- UNKNOWN
- UNKNOWN · UNKNOWN
- Battery / UPS system
- UNKNOWN
- UNKNOWN · UNKNOWN
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Tenant-level power draw and operating schedule across sub-parcels
- UNKNOWN On-site substation energization timing and line cut-in dates
- UNKNOWN Wastewater and cooling infrastructure agreements
- UNKNOWN On-site battery energy storage systems (BESS) specifications
Changes (1)
- 2026-09-26 Added to the atlas Quantum Frederick: Added to the atlas.