Meta New Albany

Hyperscale data center campus · Licking County, OH

Meta Platforms

Status Operational campus with ongoing construction VERIFIED · MODERATE Stage: Partly in service
Last checked against its sources Sep 27, 2026

Open in the interactive atlas →Company project page ↗

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Meta broke ground on its New Albany data center in 2017. The city identifies an active Meta site with construction continuing, and Meta reports more than $1.5 billion invested in New Albany. Meta's stated compute capacity and Ohio renewable generation are not recorded as facility electrical load. VERIFIED · MODERATE

Key facts

Groundbreaking
2,017
VERIFIED · MODERATE
New Albany investment
More than $1.5 billion
VERIFIED · MODERATE
Cooling and water practice
Water-efficient cooling; water reused before wastewater discharge
VERIFIED · MODERATE
Facility electrical draw capacity (MW)
UNKNOWN
UNKNOWN · UNKNOWN

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (5)