Meta New Albany
Hyperscale data center campus · Licking County, OH
Status Operational campus with ongoing construction VERIFIED · MODERATE Stage: Partly in service
Last checked against its sources Sep 27, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
Meta broke ground on its New Albany data center in 2017. The city identifies an active Meta site with construction continuing, and Meta reports more than $1.5 billion invested in New Albany. Meta's stated compute capacity and Ohio renewable generation are not recorded as facility electrical load. VERIFIED · MODERATE
Key facts
- Groundbreaking
- 2,017
- VERIFIED · MODERATE
- New Albany investment
- More than $1.5 billion
- VERIFIED · MODERATE
- Cooling and water practice
- Water-efficient cooling; water reused before wastewater discharge
- VERIFIED · MODERATE
- Facility electrical draw capacity (MW)
- UNKNOWN
- UNKNOWN · UNKNOWN
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Verified campus boundary and current completion of individual buildings
- UNKNOWN Facility electrical draw capacity and current measured load
- UNKNOWN Water consumption volume, backup generation, and battery inventory
- UNKNOWN Primary fire jurisdiction and response capabilities
Changes (1)
- 2026-09-27 Added to the atlas Meta New Albany: Added to the atlas.