Red Wolf DCD Data Center
- Paused
- Hyperscale data center proposal
- 4 sources
- Last checked Sep 28, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Paused · litigation reported
- Sourced · fair
- Area in the published hearing notice
- About 242.2 acres (hearing notice description)
- Sourced · strong
- Reported building concept
- Six buildings totaling 1.8 million square feet
- Sourced · fair
- Utility power capacity ( (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).)
- Not in the public record
- Serving utility
- Not in the public record
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 1 terms used on this page
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
Profile
A published Unified Government hearing notice names the Red Wolf DCD Data Center and describes a rezoning application for land along Parallel Parkway. Reporting in November 2025 said a protest petition and lawsuit had put the project on hold after zoning actions, while the current court disposition was not located. Public reporting describes six planned buildings totaling 1.8 million square feet; no facility power capacity is recorded. Sourced · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Backup generation details
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Fire jurisdiction
- Not in the public record
Fire and rescue stations (312)
| Name | Straight-line distance | Role |
|---|---|---|
| Kansas City Kansas Fire Department Station 8 | 0.5 mi NE | Nearby origin |
| Kansas City Kansas Fire Department Station 12 | 2.1 mi E | Nearby origin |
| Fairmount Township Fire Department Station 1 | 3.7 mi W | Nearby origin |
| Kansas City Kansas Fire Department Station 6 | 4.0 mi ESE | Nearby origin |
| Edwardsville North Fire Station 2 | 4.1 mi SSE | Nearby origin |
| Bonner Springs Fire Department | 4.7 mi S | Nearby origin |
| Kansas City Kansas Fire Department Station 4 | 5.5 mi E | Nearby origin |
| Kansas City Kansas Fire Department Station 19 | 5.9 mi ESE | Nearby origin |
| Fairmount Township Fire Department Station 2 | 6.2 mi SW | Nearby origin |
| Edwardsville Fire Department | 6.4 mi SSE | Nearby origin |
Hospitals (55)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Providence Medical Center | 4.6 mi ESE | Not in the public record |
| Dwight D Eisenhower Veterans Affairs Medical Center | 9.9 mi N | Not in the public record |
| Saint John Hospital | 10.0 mi N | Not in the public record |
| AdventHealth Prairie Star | 13 mi S | Not in the public record |
| Shawnee Mission Medical Center | 14 mi SE | Not in the public record |
| Saint Luke's North Hospital - Barry Road | 14 mi ENE | Not in the public record |
| University of Kansas Medical Center | 15 mi ESE | Not in the public record |
| Overland Park Regional Medical Center | 16 mi SSE | Not in the public record |
| Kindred Hospital Northland | 16 mi ENE | Not in the public record |
| Children's Mercy Hospital | 16 mi ESE | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Current court and zoning disposition after November 2025 was not located.
- Capacity, end user, serving utility, water demand, cooling, backup generation, and response resources are unknown.
Changes (2)
- 2026-11-14 New information Red Wolf DCD Data Center: Added reported BPU transmission thresholds and developer cost statements as area context only. Facility-specific utility, capacity, and agreement terms remain unknown; project status was not re-reviewed. Source: The Beacon.
- 2026-09-28 Added to the atlas Red Wolf DCD Data Center: Added to the atlas.
Related data centers
Others in Kansas
Cite this record
"Red Wolf DCD Data Center", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/red-wolf-wyandotte, last checked Sep 28, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.