Red Wolf DCD Data Center
Hyperscale data center proposal · Wyandotte County, KS
Status Paused · litigation reported VERIFIED · MODERATE
Last checked against its sources Sep 28, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
A published Unified Government hearing notice names the Red Wolf DCD Data Center and describes a rezoning application for land along Parallel Parkway. Reporting in November 2025 said a protest petition and lawsuit had put the project on hold after zoning actions, while the current court disposition was not located. Public reporting describes six planned buildings totaling 1.8 million square feet; no facility power capacity is recorded. VERIFIED · MODERATE
Key facts
- Area in the published hearing notice
- About 242.2 acres (hearing notice description)
- VERIFIED · HIGH
- Reported building concept
- Six buildings totaling 1.8 million square feet
- VERIFIED · MODERATE
- Utility power capacity (MW)
- UNKNOWN
- UNKNOWN · UNKNOWN
- Serving utility
- UNKNOWN
- UNKNOWN · UNKNOWN
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Current court and zoning disposition after November 2025 was not located.
- UNKNOWN Capacity, end user, serving utility, water demand, cooling, backup generation, and response resources are unknown.
Changes (1)
- 2026-09-28 Added to the atlas Red Wolf DCD Data Center: Added to the atlas.
Sources (3)
- Notice of Public Hearing: Red Wolf DCD Data Center
- DCRA manual location approximation
- Lawsuit delays $12B data center in Kansas City