Skybox Old Settlers
- Proposed
- Proposed data center
- 8 sources
- Last checked Nov 14, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- PUD 159 rezoning approved
- Sourced · strong
- PUD rezoning area
- 29.69 acres
- Sourced · strong
- PUD grid-interconnected power limit
- 75 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- Sourced · strong
- PUD data center floor-area limit
- 250,000 ft²
- Sourced · strong
- PUD cooling requirement
- Closed-loop cooling: A cooling system that recirculates the same water instead of drawing new water continuously. or similar non-continuous-draw cooling
- Sourced · strong
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 6 terms used on this page
- ERCOT (Electric Reliability Council of Texas)
- Runs the power grid that serves most of Texas and reviews requests to connect very large new users. It does not own power lines.
- IT lease
- A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.
- Utility capacity
- The most power the grid connection is sized to deliver: the size of the pipe. Draw is how much is flowing at a given moment, and is usually lower.
- Interconnection agreement
- The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- Closed-loop cooling
- A cooling system that recirculates the same water instead of drawing new water continuously.
Profile
Round Rock approved PUD 159 for the 29.69-acre Old Settlers site on February 12, 2026, following the November 2025 Planning and Zoning hearing and December 2025 first council reading. The plan permits one data center building, caps grid-interconnected power at 75 MW, and requires closed-loop or similar cooling. The approval does not establish construction, a contracted Utility capacity: The most power the grid connection is sized to deliver: the size of the pipe. Draw is how much is flowing at a given moment, and is usually lower., or an operating water demand. Sourced · strong
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Backup generator type, count, and permit
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Fire jurisdiction
- Round Rock Fire Department (NERIS boundary)
- Calculated · weak
- Jurisdiction department type
- Career
- Sourced · fair
- Department staffing
- 151 career full-time · 0 volunteer firefighters
- Sourced · fair
- Department stations
- 11 stations · 27 units
- Sourced · fair
- Services the department lists
- Structural firefighting, Hazmat technician (18 services listed in all)
- Sourced · fair
Fire and rescue stations (234)
| Name | Straight-line distance | Role |
|---|---|---|
| Round Rock Fire Department Station 6 | 1.4 mi SSE | Nearby origin |
| Round Rock Fire Department Central Station | 2.5 mi WSW | Nearby origin |
| Round Rock Fire Department Station 7 | 2.6 mi WNW | Nearby origin |
| Round Rock Fire Department Station 4 | 3.1 mi S | Nearby origin |
| Round Rock Fire Department Station 2 | 3.2 mi SW | Nearby origin |
| Round Rock Fire Station 8 | 3.4 mi SE | Nearby origin |
| Round Rock Fire Department Station 3 | 4.2 mi SSW | Nearby origin |
| Round Rock Fire Department Station 5 | 4.2 mi SW | Nearby origin |
| Round Rock Fire Station 9 | 4.7 mi WSW | Nearby origin |
| Travis County Emergency Services District Number 2 / Pflugerville Fire Department Station 4 | 5.2 mi S | Nearby origin |
Hospitals (41)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Ascension Seton Williamson Hospital | 1.6 mi NNW | Not in the public record |
| Baylor Scott and White Medical Center Round Rock | 2.7 mi WNW | Not in the public record |
| Saint David's Round Rock Medical Center | 4.7 mi WSW | Not in the public record |
| Georgetown Behavioral Health Institute | 5.3 mi NNW | Not in the public record |
| Saint David's Georgetown Hospital | 6.2 mi NNW | Not in the public record |
| Baylor Scott and White Medical Center - Pflugerville | 7.2 mi SSE | Not in the public record |
| Saint David's North Austin Medical Center | 9.8 mi SSW | Not in the public record |
| Ascension Seton Cedar Park Hospital | 9.9 mi W | Not in the public record |
| Ascension Seton Northwest Hospital | 11 mi SSW | Not in the public record |
| Baylor Scott and White Medical Center Taylor | 14 mi ENE | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Whether a site development or building permit has been issued and whether construction has begun
- Signed utility Interconnection agreement: The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for., actual site draw capacity, and named serving electric utility
- Whether Oncor requires a new substation and whether one will be built
- Backup generator specifications and any site-specific TCEQ air permit
- Water and wastewater service agreements and expected or actual volumes
- Primary fire-response jurisdiction and facility-specific response resources
Changes (2)
- 2026-11-14 New information Skybox Old Settlers: Added a reported Skybox statement that it is working with Oncor and ERCOT on power capacity. Source: CBS Austin.
- 2026-10-01 Added to the atlas Skybox Old Settlers: Added to the atlas.
Related data centers
Others in Texas
Cite this record
"Skybox Old Settlers", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/skybox-old-settlers-round-rock, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.