Skybox Old Settlers

Skybox Datacenters, LLC · Williamson County, Texas

Open in the interactive atlas →

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
PUD 159 rezoning approved
Sourced · strong
PUD rezoning area
29.69 acres
Sourced · strong
PUD grid-interconnected power limit
75 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
Sourced · strong
PUD data center floor-area limit
250,000 ft²
Sourced · strong
PUD cooling requirement
Closed-loop cooling: A cooling system that recirculates the same water instead of drawing new water continuously. or similar non-continuous-draw cooling
Sourced · strong

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 6 terms used on this page
ERCOT (Electric Reliability Council of Texas)
Runs the power grid that serves most of Texas and reviews requests to connect very large new users. It does not own power lines.
IT lease
A lease measured by the power the tenant's computers use (the IT load). The campus also needs power for cooling and other equipment, so its grid connection is larger than its IT load.
Utility capacity
The most power the grid connection is sized to deliver: the size of the pipe. Draw is how much is flowing at a given moment, and is usually lower.
Interconnection agreement
The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
Closed-loop cooling
A cooling system that recirculates the same water instead of drawing new water continuously.

Profile

Round Rock approved PUD 159 for the 29.69-acre Old Settlers site on February 12, 2026, following the November 2025 Planning and Zoning hearing and December 2025 first council reading. The plan permits one data center building, caps grid-interconnected power at 75 MW, and requires closed-loop or similar cooling. The approval does not establish construction, a contracted Utility capacity: The most power the grid connection is sized to deliver: the size of the pipe. Draw is how much is flowing at a given moment, and is usually lower., or an operating water demand. Sourced · strong

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Backup generator type, count, and permit
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Fire jurisdiction
Round Rock Fire Department (NERIS boundary)
Calculated · weak
Jurisdiction department type
Career
Sourced · fair
Department staffing
151 career full-time · 0 volunteer firefighters
Sourced · fair
Department stations
11 stations · 27 units
Sourced · fair
Services the department lists
Structural firefighting, Hazmat technician (18 services listed in all)
Sourced · fair

Fire and rescue stations (234)

NameStraight-line distanceRole
Round Rock Fire Department Station 6
Round Rock Fire Department
1.4 mi SSENearby origin
Round Rock Fire Department Central Station
Round Rock Fire Department
2.5 mi WSWNearby origin
Round Rock Fire Department Station 7
Round Rock Fire Department
2.6 mi WNWNearby origin
Round Rock Fire Department Station 4
Round Rock Fire Department
3.1 mi SNearby origin
Round Rock Fire Department Station 2
Round Rock Fire Department
3.2 mi SWNearby origin
Round Rock Fire Station 8
Round Rock Fire Department
3.4 mi SENearby origin
Round Rock Fire Department Station 34.2 mi SSWNearby origin
Round Rock Fire Department Station 5
Round Rock Fire Department
4.2 mi SWNearby origin
Round Rock Fire Station 9
Round Rock Fire Department
4.7 mi WSWNearby origin
Travis County Emergency Services District Number 2 / Pflugerville Fire Department Station 4
Travis County Emergency Services District No. 2
5.2 mi SNearby origin

The nearest 10 of 234. See all of them in the atlas →

Hospitals (41)

NameStraight-line distanceEmergency department
Ascension Seton Williamson Hospital1.6 mi NNWNot in the public record
Baylor Scott and White Medical Center Round Rock2.7 mi WNWNot in the public record
Saint David's Round Rock Medical Center4.7 mi WSWNot in the public record
Georgetown Behavioral Health Institute5.3 mi NNWNot in the public record
Saint David's Georgetown Hospital6.2 mi NNWNot in the public record
Baylor Scott and White Medical Center - Pflugerville7.2 mi SSENot in the public record
Saint David's North Austin Medical Center9.8 mi SSWNot in the public record
Ascension Seton Cedar Park Hospital9.9 mi WNot in the public record
Ascension Seton Northwest Hospital11 mi SSWNot in the public record
Baylor Scott and White Medical Center Taylor14 mi ENENot in the public record

The nearest 10 of 41. See all of them in the atlas →

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Whether a site development or building permit has been issued and whether construction has begun
  • Signed utility Interconnection agreement: The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for., actual site draw capacity, and named serving electric utility
  • Whether Oncor requires a new substation and whether one will be built
  • Backup generator specifications and any site-specific TCEQ air permit
  • Water and wastewater service agreements and expected or actual volumes
  • Primary fire-response jurisdiction and facility-specific response resources

Changes (2)

Related data centers

Others in Texas

Cite this record

"Skybox Old Settlers", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/skybox-old-settlers-round-rock, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.