Aligned Data Centers Frederick (IAD-04)
Hyperscale data center campus · Frederick County, MD
Status In development VERIFIED · MODERATE Stage: Under construction
Last checked against its sources Sep 26, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
Aligned Data Centers' Frederick campus is a planned 264 MW hyperscale development on 75 acres within the Quantum Frederick park in Adamstown, Maryland. The master plan includes four data center buildings connected directly to the Northern Virginia data center market via the QLoop fiber corridor. Initial permitting delays over backup generation contributed to Maryland's 2024 Critical Infrastructure Streamlining Act. VERIFIED · MODERATE
Key facts
- Planned campus capacity
- 264 MW planned capacity across 4 buildings
- VERIFIED · MODERATE
- Campus area
- 75-acre parcel
- VERIFIED · HIGH
- Backup generation
- UNKNOWN
- UNKNOWN · UNKNOWN
- Battery / UPS system
- UNKNOWN
- UNKNOWN · UNKNOWN
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Commissioning date for initial building (IAD-04)
- UNKNOWN Final backup generator configuration under 2024 state streamlining legislation
- UNKNOWN Cooling system design and water consumption metrics
Changes (1)
- 2026-09-26 Added to the atlas Aligned Data Centers Frederick (IAD-04): Added to the atlas.