Aligned Data Centers Frederick (IAD-04)

Hyperscale data center campus · Frederick County, MD

Aligned Data Centers

Status In development VERIFIED · MODERATE Stage: Under construction
Last checked against its sources Sep 26, 2026

Open in the interactive atlas →Company project page ↗

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Aligned Data Centers' Frederick campus is a planned 264 MW hyperscale development on 75 acres within the Quantum Frederick park in Adamstown, Maryland. The master plan includes four data center buildings connected directly to the Northern Virginia data center market via the QLoop fiber corridor. Initial permitting delays over backup generation contributed to Maryland's 2024 Critical Infrastructure Streamlining Act. VERIFIED · MODERATE

Key facts

Planned campus capacity
264 MW planned capacity across 4 buildings
VERIFIED · MODERATE
Campus area
75-acre parcel
VERIFIED · HIGH
Backup generation
UNKNOWN
UNKNOWN · UNKNOWN
Battery / UPS system
UNKNOWN
UNKNOWN · UNKNOWN

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (4)

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.