Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Proposed / paused
- Sourced · fair
- Planned campus capacity
- 360 (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh). planned capacity across 5 buildings
- Sourced · fair
- Campus area
- 110–170 acre brownfield site
- Sourced · fair
- Backup generation
- Not in the public record
- Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 4 terms used on this page
- Interconnection agreement
- The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for.
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
- Energization
- The first time power flows to a new site from the grid. It comes before full operation.
Profile
The Atmosphere Dickerson Campus is a proposed 360 MW hyperscale data center development at the decommissioned Dickerson coal-fired power station in Montgomery County, Maryland. The proposal includes five buildings on approximately 110 to 170 acres, utilizing legacy power plant grid interconnections and proximity to Potomac fiber routes. Development is currently paused under Montgomery County's 18-month data center moratorium passed in July 2026. Sourced · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules · PJM
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Battery / UPS system
- Not in the public record
- Backup generation
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Fire jurisdiction
- Not in the public record
Fire and rescue stations (502)
| Name | Straight-line distance | Role |
|---|---|---|
| Upper Montgomery County Volunteer Fire Department - Station 14 | 3.6 mi SE | Nearby origin |
| Lucketts Fire and Rescue Company 10 | 4.0 mi W | Nearby origin |
| Carroll Manor Fire Company Station 28 | 6.0 mi NW | Nearby origin |
| Carroll Manor Fire Company Station 14 | 6.4 mi N | Nearby origin |
| Hyattstown Volunteer Fire Department - Station 9 | 8.8 mi ENE | Nearby origin |
| Leesburg Volunteer Fire Company Station 20 | 8.8 mi SSW | Nearby origin |
| Leesburg Volunteer Fire Company Station 1 | 9.2 mi SW | Nearby origin |
| Urbana Volunteer Fire and Rescue Company Station 23 | 9.4 mi NE | Nearby origin |
| Montgomery County Fire Rescue Station 35 - Clarksburg | 9.5 mi E | Nearby origin |
| Lansdowne Public Safety Center Company 22 | 9.8 mi S | Nearby origin |
Hospitals (87)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Inova Loudoun Hospital | 9.9 mi S | Not in the public record |
| Holy Cross Germantown Hospital | 12 mi ESE | Not in the public record |
| Frederick Health Hospital | 14 mi N | Not in the public record |
| Adventist Healthcare Shady Grove Medical Center | 16 mi ESE | Not in the public record |
| Reston Hospital Center | 18 mi SSE | Not in the public record |
| Stone Springs Hospital Center | 20 mi SSW | Not in the public record |
| Medstar Montgomery Medical Center | 22 mi ESE | Not in the public record |
| Jefferson Medical Center | 22 mi WNW | Not in the public record |
| Inova Fair Oaks Hospital | 23 mi S | Not in the public record |
| Suburban Hospital | 24 mi SE | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Outcome of legal challenge to Montgomery County moratorium
- Potomac River cooling water withdrawal approvals
- Substation Interconnection agreement: The contract with the utility to connect a large user to the grid, setting how much power the connection is sized for. and Energization: The first time power flows to a new site from the grid. It comes before full operation. date
Changes (2)
- 2026-11-14 New information Atmosphere Dickerson Campus: Added the developer's statement that power will come over FirstEnergy lines bordering the site; the serving utility remains unsettled. Source: Atmosphere Data Centers (project website).
- 2026-09-26 Added to the atlas Atmosphere Dickerson Campus: Added to the atlas.
Related data centers
Others in Maryland
Cite this record
"Atmosphere Dickerson Campus", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/atmosphere-dickerson, last checked Sep 26, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.