PORTS-Pike Technology Campus
AI data center campus · Pike County, OH
Status Early civil works underway VERIFIED · MODERATE Stage: Under construction
Last checked against its sources Sep 30, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
DOE announced an SB Energy data-center development on the Portsmouth Site near Piketon in March 2026, with an initial phase on 189 acres. The developer says early civil works have begun and describes an approximately 800 MW first phase, with capacity expected online in phases beginning in 2028. These are plans, not current load or operating capacity; the separate generation program is not recorded as facility load. VERIFIED · MODERATE
Key facts
- Announced first-phase scale
- Approximately 800 MW planned
- VERIFIED · MODERATE
- Initial DOE site area
- 189 acres
- VERIFIED · HIGH
- First capacity target
- 2028
- VERIFIED · MODERATE
- Planned cooling
- Closed-loop cooling
- VERIFIED · MODERATE
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Exact data-center parcel and final design
- UNKNOWN Approved utility-service capacity and measured operating load
- UNKNOWN Backup generation, battery systems, and actual water use
- UNKNOWN Primary fire jurisdiction and response capabilities
Changes (1)
- 2026-09-30 Added to the atlas PORTS-Pike Technology Campus: Added to the atlas.