Red Oak PD-191 data center campus

UNKNOWN · Ellis County, Texas

Open in the interactive atlas →

Key facts

Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.

What the labels mean
Sourced
A cited source states it. Open the source to see who said it.
Calculated
DCRA calculated it from sourced values. The math is shown.
Estimate
An approximation where no source states the value.
Modeled
Output of an illustrative planning scenario. Not a forecast.
Unknown
Not in the public record. Unknown, not absent.
Sourced · strong
Strong: read directly in a primary record, such as a filing or the company's own release.
Sourced · fair
Fair: a company statement of its own plans, an official's written reply, or a solid report.
Sourced · weak
Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.

The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.

Status
Rezoning approved; construction unconfirmed
Sourced · fair
Rezoning area
828.8 acres
Sourced · strong
Facility electrical draw capacity ( (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).)
Not in the public record
Confirmed serving utility
Not in the public record
Confirmed construction start
Not in the public record

"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.

Plain-language glossary: 2 terms used on this page
MW (megawatt)
A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
UPS (uninterruptible power supply)
Batteries that keep computers running through the seconds between a power loss and backup generators starting.

Profile

Red Oak's May 2026 council agenda identified an 828.8-acre rezoning petition for a high-tech industrial park in Ellis County. Two independent local reports say council approved the rezoning and tax abatement 4-1; the Ellis County Press reported that Compass had the property under contract for a second campus. The approval is a planning milestone, not proof of construction or operating load. Sourced · fair

Power and the grid

What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.

Loading grid records…

Published grid documents and the capacity comparison are in the interactive atlas, under Energy.

Who pays for the grid equipment

Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.

Filed grid projects

No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.

Who pays for this facility's connection

Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.

The rules

No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.

Hazards

Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.

What this facility's record says

Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
Not in the public record
Backup generation
Not in the public record

Emergency response

The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.

Fire jurisdiction

Primary fire jurisdiction
Not in the public record

Fire and rescue stations (481)

NameStraight-line distanceRole
Red Oak Fire Rescue Department Central Station
Red Oak Fire Department
0.8 mi NNENearby origin
Red Oak Fire Rescue Department Station 2
Red Oak Fire Department
2.9 mi ENearby origin
Glenn Heights Fire Department3.5 mi NWNearby origin
Ovilla Fire Department4.6 mi WNearby origin
Lancaster Fire Department Station 3
Lancaster Fire Department
5.0 mi NNearby origin
Ellis County Emergency Services District 6 Fire Station 2
Ellis County Esd #6
5.1 mi SSWNearby origin
Desoto Fire Rescue Station 2625.5 mi NNWNearby origin
DeSoto Fire / Rescue6.4 mi NNWNearby origin
Waxahachie Fire Department Station 3
Waxahachie Fire-Rescue
6.6 mi SSWNearby origin
Lancaster Fire Department Station 1
Lancaster Fire Department
6.8 mi NNENearby origin

The nearest 10 of 481. See all of them in the atlas →

Hospitals (120)

NameStraight-line distanceEmergency department
Baylor Scott and White Medical Center - Waxahachie7.0 mi SSWNot in the public record
Hickory Trail Hospital8.1 mi NNWNot in the public record
Methodist Rehabilitation Hospital9.4 mi NNWNot in the public record
Select Specialty Hospital - South Dallas9.5 mi NNWNot in the public record
Methodist Charlton Family Medicine Center9.5 mi NNWNot in the public record
Methodist Midlothian Medical Center11 mi WSWNot in the public record
Dallas Veterans Affairs Medical Center12 mi NNot in the public record
Methodist Dallas Medical Center17 mi NNot in the public record
Texas Health Hospital Mansfield17 mi WNot in the public record
Methodist Mansfield Medical Center17 mi WNWNot in the public record

The nearest 10 of 120. See all of them in the atlas →

Distances: Calculated · weak

Sources for these stations and hospitals (2)

What this record is missing

No public source yet for:

  • Confirmed developer and final campus design
  • Building permits, construction start, and phase schedule
  • Utility service, electrical capacity, and water use
  • Backup generation and primary fire response

Changes (2)

Related data centers

Others in Texas

Cite this record

"Red Oak PD-191 data center campus", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/red-oak-pd191-data-center, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.

Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.