Red Oak PD-191 data center campus
- Permitting / approvals
- Proposed hyperscale campus
- 5 sources
- Last checked Nov 14, 2026
Key facts
Each value says what backs it, then how much weight it bears: Sourced (a cited source states it), Calculated (DCRA did the math, shown), or Unknown (not in the public record); then strong, fair, or weak. Weak labels are highlighted.
What the labels mean
- Sourced
- A cited source states it. Open the source to see who said it.
- Calculated
- DCRA calculated it from sourced values. The math is shown.
- Estimate
- An approximation where no source states the value.
- Modeled
- Output of an illustrative planning scenario. Not a forecast.
- Unknown
- Not in the public record. Unknown, not absent.
- Sourced · strong
- Strong: read directly in a primary record, such as a filing or the company's own release.
- Sourced · fair
- Fair: a company statement of its own plans, an official's written reply, or a solid report.
- Sourced · weak
- Highlighted. Weak: a secondhand account, a search excerpt, or a value that may be out of date.
The words are display only. The records and the dataset keep the original values (VERIFIED, DERIVED, ESTIMATED, MODELED, UNKNOWN; HIGH, MODERATE, LOW): Sourced is VERIFIED, Calculated is DERIVED, and strong, fair, and weak are HIGH, MODERATE, and LOW.
- Status
- Rezoning approved; construction unconfirmed
- Sourced · fair
- Rezoning area
- 828.8 acres
- Sourced · strong
- Facility electrical draw capacity ( (megawatt)MW (megawatt): A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).)
- Not in the public record
- Confirmed serving utility
- Not in the public record
- Confirmed construction start
- Not in the public record
"Not in the public record" means unknown, not absent. How DCRA sources and labels its records.
Plain-language glossary: 2 terms used on this page
- MW (megawatt)
- A measure of power at one moment. 1,000 MW is 1 GW (gigawatt). Energy used over time is measured in megawatt-hours (MWh).
- UPS (uninterruptible power supply)
- Batteries that keep computers running through the seconds between a power loss and backup generators starting.
Profile
Red Oak's May 2026 council agenda identified an 828.8-acre rezoning petition for a high-tech industrial park in Ellis County. Two independent local reports say council approved the rezoning and tax abatement 4-1; the Ellis County Press reported that Compass had the property under contract for a second campus. The approval is a planning milestone, not proof of construction or operating load. Sourced · fair
Power and the grid
What published records say about supplying this data center, and how its planned power compares in size with local demand today. A size comparison is not a grid study. Each label opens its sources.
Loading grid records…
Published grid documents and the capacity comparison are in the interactive atlas, under Energy.
Who pays for the grid equipment
Substations, lines, and transformers filed for this data center or its area, what each is filed to cost, and who the rules and documents say pays. Only filed or published documents are used; a cost with no document is unknown.
Filed grid projects
No filed substation, line, or transformer project is recorded for this facility yet. That means none has been researched or found, not that none exists.
Who pays for this facility's connection
Unknown No filed document or company statement recorded by DCRA says who paid, or will pay, for this facility's connection.
The rules
No cost rules are recorded for this region yet. DCRA adds a region's rules only after reading them in the regulator's or grid operator's own text.
Hazards
Materials a data center like this may hold, sorted by what is known about this one: confirmed at this facility, or only typical of the equipment and not confirmed here. A short reference, not a safety data sheet.
What this facility's record says
- Battery / (uninterruptible power supply)UPS (uninterruptible power supply): Batteries that keep computers running through the seconds between a power loss and backup generators starting. system
- Not in the public record
- Backup generation
- Not in the public record
Lithium-ion batteries
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Batteries may re-ignite after apparent extinguishment; extended monitoring is a planning consideration.
- Large volumes of water for cooling are frequently cited; the NIRS 2025 incident reported submersion of battery packs in water tanks.
- Site pre-plans, facility subject-matter experts, and installation documentation (NFPA 855, UL 9540A results) are the appropriate inputs for tactics.
Diesel fuel
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Foam and fuel-fire tactics apply to pool fires; tank quantity and containment design are UNKNOWN at Beacon Point.
Transformer insulating fluid
Associated with equipment category · not verified hereAssociated with the data-center equipment category; not verified at this facility. Unknown
Firefighting considerations and references
- Energized equipment: coordinate isolation with the utility before direct attack.
Emergency response
The fire department responsible for this site and the recorded fire stations and hospitals nearby, by straight-line distance from the approximate facility point. Not a dispatch order, response time, or first-due determination; mutual-aid roles are potential only. A capability missing from the public record is unknown, not absent.
Fire jurisdiction
- Primary fire jurisdiction
- Not in the public record
Fire and rescue stations (481)
| Name | Straight-line distance | Role |
|---|---|---|
| Red Oak Fire Rescue Department Central Station | 0.8 mi NNE | Nearby origin |
| Red Oak Fire Rescue Department Station 2 | 2.9 mi E | Nearby origin |
| Glenn Heights Fire Department | 3.5 mi NW | Nearby origin |
| Ovilla Fire Department | 4.6 mi W | Nearby origin |
| Lancaster Fire Department Station 3 | 5.0 mi N | Nearby origin |
| Ellis County Emergency Services District 6 Fire Station 2 | 5.1 mi SSW | Nearby origin |
| Desoto Fire Rescue Station 262 | 5.5 mi NNW | Nearby origin |
| DeSoto Fire / Rescue | 6.4 mi NNW | Nearby origin |
| Waxahachie Fire Department Station 3 | 6.6 mi SSW | Nearby origin |
| Lancaster Fire Department Station 1 | 6.8 mi NNE | Nearby origin |
Hospitals (120)
| Name | Straight-line distance | Emergency department |
|---|---|---|
| Baylor Scott and White Medical Center - Waxahachie | 7.0 mi SSW | Not in the public record |
| Hickory Trail Hospital | 8.1 mi NNW | Not in the public record |
| Methodist Rehabilitation Hospital | 9.4 mi NNW | Not in the public record |
| Select Specialty Hospital - South Dallas | 9.5 mi NNW | Not in the public record |
| Methodist Charlton Family Medicine Center | 9.5 mi NNW | Not in the public record |
| Methodist Midlothian Medical Center | 11 mi WSW | Not in the public record |
| Dallas Veterans Affairs Medical Center | 12 mi N | Not in the public record |
| Methodist Dallas Medical Center | 17 mi N | Not in the public record |
| Texas Health Hospital Mansfield | 17 mi W | Not in the public record |
| Methodist Mansfield Medical Center | 17 mi WNW | Not in the public record |
Sources for these stations and hospitals (2)
What this record is missing
No public source yet for:
- Confirmed developer and final campus design
- Building permits, construction start, and phase schedule
- Utility service, electrical capacity, and water use
- Backup generation and primary fire response
Changes (2)
- 2026-11-02 New information Red Oak PD-191 data center campus: Added a news report that a city briefing cited $72 million in grid reinforcements for the project (secondhand; the briefing was not found). Source: Dallas Observer.
- 2026-09-30 Added to the atlas Red Oak PD-191 data center campus: Added to the atlas.
Related data centers
Others in Texas
Cite this record
"Red Oak PD-191 data center campus", Data Center Risk Atlas, https://datacenterriskatlas.org/facilities/red-oak-pd191-data-center, last checked Nov 14, 2026. Licensed under CC BY-NC 4.0.
Each record lists its own public sources. Cite those directly when a claim depends on them. See reuse and commercial licensing.