Microsoft ATL80
Proposed hyperscale campus · Floyd County, GA
Status DRI review filing; local approvals unresolved VERIFIED · MODERATE Stage: Permitting / approvals
Last checked against its sources Oct 28, 2026
The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.
Profile
Floyd County's DRI 4860 identifies Microsoft as developer of ATL80, a proposed three-building campus on 349.03 acres north of Huffaker Road. The energy form estimates 422 MW of peak connected load and names Georgia Power as the proposed supplier. These filing statements establish neither secured service nor completed construction. VERIFIED · MODERATE
Key facts
- Filed site area
- 349.03 acres
- VERIFIED · HIGH
- Proposed data-center buildings
- 3
- VERIFIED · HIGH
- Filing estimate of peak connected electrical load
- 422 MW
- ESTIMATED · MODERATE
- Proposed backup generation
- Backup diesel generators
- VERIFIED · MODERATE
VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.
Open questions
- UNKNOWN Parcel-level location and campus boundary
- UNKNOWN Issued local permits, secured electric service and construction start
- UNKNOWN Cooling design, measured water use, generator quantities and fire jurisdiction
Changes (1)
- 2026-10-28 Added to the atlas Microsoft ATL80: Added from the October 20 DRI filing.
Sources (4)
- DRI 4860: ATL80 initial information form
- DRI 4860: ATL80 information form part 2
- State of Georgia Counties - 2020 Census
- DCRA manual location approximation