Google Haskell County (with Intersect Quantum)

Data center + co-located solar/storage · Haskell County, TX

Google LLC; Intersect (co-located energy)

Status Under construction · solar/storage operating VERIFIED · MODERATE
Last checked against its sources Sep 24, 2026

Open in the interactive atlas →

The atlas adds the map, nearby response resources, infrastructure dependencies, hazards, and illustrative planning scenarios for this site.

Profile

Google announced two data center campuses in Haskell County in November 2025 as part of a $40 billion Texas investment through 2027. One is co-located with Intersect's Quantum I and II solar and storage project (640 MW solar, 1.3 GWh battery storage), which began operating in June 2026 while the data center was under construction. VERIFIED · MODERATE

Key facts

Co-located solar
640 MW (Quantum I & II)
VERIFIED · MODERATE
Co-located battery storage
1.3 GWh
VERIFIED · MODERATE
Solar/storage operations began
June 2026
VERIFIED · MODERATE
Announced program
Two Haskell County campuses; part of $40B Texas investment through 2027
VERIFIED · HIGH

VERIFIED values are stated by a cited source; DERIVED values are calculated from them; ESTIMATED values are approximations; UNKNOWN means no reliable public information, not absence. The map point is approximate and is not a parcel boundary.

Open questions

Changes (1)

Sources (3)

Planning and visualization only. DCRA is not a dispatch system, forecast, exposure or casualty model, or compliance determination. Scenarios in the atlas are hypothetical and do not predict what will happen at any facility.